Decision 0025Accepted

The Integrate phase, home offices, one shape for work, and live changes

Accepted 29 Sept 2026 · in force

0025. The Integrate phase, home offices, one shape for work, and live changes

  • Status: Accepted
  • Date: 2026-09-29
  • Supersedes: the projects’ Install and Commission phases (introduced with projects in 0018); the single remote site and its kit groups in 0010; kit positions such as kit-07/network-gateway in 0024
  • From: review feedback on the Install and Commission phases, home offices and shared work

Context

Installing a device and getting it working were two phases, Install and Commission, with provisioning and configuring filed under one or the other. The owner wanted them together. Remote workers were two anonymous groups of kits at one site called Willow,so nobody could say where a person works or which home office a ticket is about. The schedule, the master view and the home page each worked out “what work is there” in their own way. And changes to work lived in one browser only,with no history of who did what.

Decision

Phases. Plan, Design, Procure, Integrate, Hand over, Closed. Integrate holds four steps for each device: Provision (the system records: asset, address and DNS, device management, booking, monitoring, licence, firmware check), Install, Configure (the setup order, then Set and Verify) and Commission (verification, test call, healthy checks). A playbook may skip phases but keeps the rest in order; a project’s phase rail shows only its playbook’s phases. Tasks gain a configure kind; provision now means the system records only. A one-off migration (tools/migrations/2026-09-29-integrate-phase.mjs) merged each project’s install and commission history into one integrate entry, with the old entries kept whole under steps, and merged the playbooks’ two phases, tagging each step with its device step. Links to #install or #commission, and ?phase=install, still land on Integrate.

Task dates. A task may have a start and a where (onsite or remote). Left out, the start is worked back from the due date at six hours a working day, and survey, install, configure, commission and records work is on site.

Home offices. The remote site becomes three: Remote EMEA (rem), Remote Americas (ram) and Remote APAC (rap), so region filters and regional managers see their home offices. Each home office is a room of its own, built to one option of the remote-home room profile, with its own install (monitor and gateway, plus a dock on the Mac option) and its town, country and near (the nearest office, in the same region). 104 home offices sit in real towns near the offices, named only for the country, plug and time zone, and labelled by town and number (“Bray home office 1”), never by a person. A second one-off migration (tools/migrations/2026-09-29-home-offices.mjs) moved the 55 old kits into the first home offices, keeping their asset tags and install dates, and numbered the rest on from AG-001451. Old /rooms/rem-kit-01/ and /rooms/rem-kit-02/ links land on the list of home offices.

People’s bases. Every person has a base (an office, or their home office), the office they go to and their office_days. Nine of the demo team work from home offices. The validator checks each base, office and day.

One shape for work. src/lib/work.mjs turns project tasks, incidents, Lab tests, year-plan events, the service managers’ inbox, time off, site visits and units due in the work plan into {id, kind, title, who, site, room, start, end, hours, status, href, project, where}, with views by person, day, site and kind, and where each person is on a day. who is always a list. The rules are in workcore.mjs, which loads no data and is unit tested.

Live changes. src/lib/live.mjs records each change to work as an event {id, at, who, item, field, before, after}. A page shows the data it was built with with the events replayed on top, which gives a history on every item, versions to step back through, and Undo as a new event (nothing is deleted). Events are kept under rs5-live and travel between windows over BroadcastChannel, with presence by heartbeat. The store and the transport are two small interfaces (load/append, send/listen), so a sync server can replace them without touching pages. LiveBar shows who else is on a page, says “Live between windows on this computer (demo)”, and holds the History drawer. Project task ticks and assignments use it first. Each window keeps its own person, so two windows can be two roles side by side.

Consequences

  • 1,414 units become 1,525 (111 new home office units); 203 rooms become 305; 11 sites become 13.
  • 21 new Integrate tasks, so 31 open Integrate tasks fall due in the fortnight from the demo’s today, across PRJ-11 to PRJ-14 and PRJ-20, a new project setting up four new starters’ home offices.
  • The year plan page (/planning/) still takes the first six phases for its gantt, which now includes Closed; it should use OPEN_PHASES.
  • A shared session across computers needs a sync server; until then the label says so (known gap 11). View as is still shared by every window (known gap 12).
  • Endpoints (laptops, phones) stay out of scope: a home office tracks only the monitor, dock and gateway.

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About 0025 The Integrate phase, home offices, one shape for work, and live changes

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.