Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Projects is switched off

Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.

Organisation settings

PlanningSimulated

Schedule

13 items need cover · 3 people over-booked in the next 4 weekschecked just now

Filters

July 2026 to June 2027Jul26AugSeptOctNovDecJan27FebMarAprMayJun
New York office X52 refresh, second batchProposed · New York office · raised by Refresh plannerProposed
Copenhagen meeting room refreshApproved · Copenhagen office · raised by Sofia ReyesApproved
Dublin office MDF UPS replacementProposed · Dublin office · raised by Declan MooreProposed
Scheduler panels on bookable roomsIdea · Dublin office · raised by Nora WalshIdea
Delivery9 people with work this year12 h10 h14 h211 h161 h108 h28 h38 h32 h19 h11 h7 h
On site9 people with work this year17 h45 h191 h76 h74 h31 h26 h15 h9 h5 h4 h
IT infrastructure3 people with work this year6 h17 h40 h28 h35 h51 h2 h2 h
AV service2 people with work this year4 h8 h69 h20 h5 h3 h2 h2 h2 h
Service desk1 person with work this year5 h
Leadership1 person with work this year2 h2 h2 h2 h2 h
Reviews and budget
Programme manager, both service managers, head of AV and IT
  • Provision
  • Install
  • Configure
  • Commission
  • Other project work
  • Site visit
  • Client event
  • Room check
  • Incident
  • Lab test
  • Work plan
  • Time off
  • Public holiday
  • Phase end
  • Planning
  • Needs cover
  • Visiting
  • Phase done
  • Current phase
  • Still to come
  • Pipeline
  • Lab test
  • Due in the work plan
  • Change freeze
  • Light (half or less)
  • Busy
  • Full
  • Too much
  • Load: hours booked against six hours a working day
How the schedule works

Where people are comes from each person's base and office days (a home office or an office), their booked time off, public holidays where they work, and any site visit or on-site task on the day. A dashed chip on a site means the person is visiting.

Load is the hours of work on each day (a task's hours spread over its days) plus project time not yet split into tasks, against six hours a working day. Time off and holidays take a day away.

Assigning. Managers hand work to the people they manage, project managers to their project team, and the head of AV and IT, the delivery manager and the programme manager to anyone. Drag a piece of work from Unscheduled onto a person and day, or choose Assign on it. Every change says who and when, can be undone, and shows at once in any other window on this computer.

Unscheduled holds work whose owner is away on a planned day (needs cover), work with nobody on it, and this year's work-plan swaps that have no day booked yet.

Assign

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About Schedule

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.