Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Vendor portalSimulated

Your installation

11 devices to record · 5 waiting on Aigna's reviewchecked just now

2.02 HeronSmall meeting roomRecorded, waiting for reviewSpace design
PositionSerial numberMAC addressCheck
DisplayModel per project · jnu-202-dsp01DEMO-JNU-00047302:52:53:72:71:C6
Video barPoly Studio X52 · jnu-202-vc01DEMO-JNU-00047402:52:53:72:71:C7
Touch controllerPoly TC10 · jnu-202-tc01DEMO-JNU-00047502:52:53:72:71:C8
HDBaseT transmitter: the laptop connection at the tableKramer EXT3-C-XR-TDEMO-JNU-000476Not networked
HDBaseT receiver at the displayKramer EXT3-POE-XR-RDEMO-JNU-000477Not networked
2.03 WrenHuddle room, smallTo recordSpace design
PositionSerial numberMAC addressCheck
DisplayModel per project · jnu-203-dsp01
Video barLogitech MeetUp 2 · jnu-203-vc01

Photograph each label before mounting; the review checks the photo against what you typed.

2.04 Focus 2.04Focus roomAccepted by AignaSpace design
PositionSerial numberMAC addressCheck
2.05 Focus 2.05Focus roomAccepted by AignaSpace design
PositionSerial numberMAC addressCheck
2.06 Copy and printPrint roomTo recordSpace design
PositionSerial numberMAC addressCheck
PrinterCanon imageRUNNER ADVANCE DX C259 · jnu-206-prn01

Photograph each label before mounting; the review checks the photo against what you typed.

2.07 Flex desks AHot deskTo recordSpace design

Photograph each label before mounting; the review checks the photo against what you typed.

Your pack for this project

What Aigna gives you at each phase
  1. PlanSite survey pack: floor, space types, mains voltage and plugs, access hours
  2. DesignSpace type drawings, wiring and outlets for every room, and the configurations
  3. DeployThe positions to record, hostnames, and the port each device goes to
  4. Hand overSnag list and what the delivery engineer accepted

Spaces and their designs

Models and how to set them up

Your steps in the new office build playbook

  1. Vendor site survey and a review of the designDesign
  2. Vendor confirms delivery dates and sends serials and MACs before deliveryProcure · Through the vendor portal
  3. Record serial and MAC for each position, with a label photoDeploy · Through the vendor portal
  4. Cabling and containmentDeploy
  5. Mount and connect devices to the designDeploy
  6. Vendor fixes snags on their work within five working daysDeploy
  7. As-built drawings and a photo of every wall and rack from the vendorHand over

You are signed in as Aigna staff, so this is a preview of each vendor. To see Keia Atlas exactly as a vendor does, pick them in the switcher under your name, bottom left.

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About Your installation

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.