RAMS NL-2301: Swap the lecture theatre microphones

Demo template. A demo template, not professional safety advice. A competent person must check every RAMS against the site, the work and the law where it happens before anyone relies on it.

Generated from the record, reviewed by Sam Okafor

Client
Fenwater Health
Site
Cambridge clinic, Lecture theatre
When
Wed 30 Sep
Crew
Ava Morales, Leo Hart
For
FW-INC-2201 · visit at risk
Generated
24 Sep 2026, 15:40

The work, and what the record says

  • Fit ceiling microphones · Listed on the job, 2 × Poly IP Ceiling Microphone
  • Run and terminate cable · Listed on the job, 1 × Cat 6A cable, 305 m box
  • Work in the comms room · Cables end in The IDF on level 1, with Fenwater estates
  • Northlight's survey (Lecture theatre, 12 Sep 2026, Sam Okafor): ceiling 6.2 m
  • Northlight's survey (Lecture theatre, 12 Sep 2026, Sam Okafor): raked seating; a mobile platform on the flat floor at the front reaches the ceiling
  • Northlight's survey (Lecture theatre, 12 Sep 2026, Sam Okafor): comms in the IDF on level 1, with Fenwater estates
  • Northlight's survey (Lecture theatre, 12 Sep 2026, Sam Okafor): a clinical education building, in use during the day
  • Fenwater Health: Above-ceiling permit with infection control, issued 25 Sep

Risk after controls

Likelihood up, 1 rare to 5 almost certainSeverity across, 1 to 5

Low, 1 to 4Medium, 5 to 12High, 15 and above

Before controls: 1 high, 6 medium, 0 low.

Hazards and controls

  1. H1Working at height

    Work above 2 m: ceiling microphones at 6.2 m and cable through the ceiling at 6.2 m.

    Who might be harmed
    The crew; Patients, staff and visitors below (dropped tools)
    Controls
    • A mobile elevating work platform (MEWP): above 3.5 m podium steps do not reach
    • Only people with in-date working at height training work above 2 m
    • The area below kept clear with barriers and a sign
    • Tools on lanyards; nothing loose on the platform

    Source: Northlight's survey (Lecture theatre, 12 Sep 2026, Sam Okafor): ceiling 6.2 m. Northlight's survey (Lecture theatre, 12 Sep 2026, Sam Okafor): ceiling 6.2 m

    Before High · 3 × 5After Medium · 1 × 5
  2. H2Operating a mobile platform

    The ceiling is 6.2 m high: the platform could tip, trap or strike someone. Raked seating; a mobile platform on the flat floor at the front reaches the ceiling.

    Who might be harmed
    The crew; Patients, staff and visitors
    Controls
    • An IPAF-trained operator, with a second person on the ground throughout
    • Outriggers set on the flat floor only, checked before each lift
    • The platform area fenced off while it moves

    Source: Northlight's survey (Lecture theatre, 12 Sep 2026, Sam Okafor): ceiling 6.2 m. Northlight's survey (Lecture theatre, 12 Sep 2026, Sam Okafor): raked seating; a mobile platform on the flat floor at the front reaches the ceiling

    Before Medium · 2 × 5After Medium · 1 × 5
  3. H3Hidden cables and pipes when drilling

    Fixings for mounts and brackets go into walls or ceilings that may hide power cables or pipes.

    Who might be harmed
    The crew; Patients, staff and visitors
    Controls
    • A cable and pipe detector over every fixing point before drilling
    • Fixings only where the client's drawings or the site contact confirm it is clear
    • Stop and report anything unexpected

    Source: Tasks: fit ceiling microphones (Listed on the job, 2 × Poly IP Ceiling Microphone)

    Before Medium · 2 × 4After Low · 1 × 4
  4. H4Work beside live equipment in the comms room

    The IDF on level 1, with Fenwater estates: patching beside switches that carry the building's network.

    Who might be harmed
    The crew; Everyone on the client's network (an outage)
    Controls
    • Access approved by the client; the rack left as found
    • Only the ports on the job touched; live patching never moved
    • No food or drink in the room

    Source: Northlight's survey (Lecture theatre, 12 Sep 2026, Sam Okafor): comms in the IDF on level 1, with Fenwater estates

    Before Medium · 2 × 3After Low · 1 × 3
  5. H5Working near patients

    A clinical education building, in use during the day: patients, staff and visitors pass close to the work.

    Who might be harmed
    Patients, staff and visitors
    Controls
    • Barriers and signs round the work area
    • Noisy work and drilling booked with the site contact, out of hours where possible
    • Corridors and doors kept clear; cables never left across a walkway

    Source: Northlight's survey (Lecture theatre, 12 Sep 2026, Sam Okafor): a clinical education building, in use during the day

    Before Medium · 3 × 3After Low · 1 × 3
  6. H6Dust from the ceiling void

    Opening ceiling tiles near clinical areas can release dust and spores.

    Who might be harmed
    Patients; Staff
    Controls
    • The client's above-ceiling permit with infection control, before any tile is lifted
    • Dust sheets and a HEPA vacuum; tiles back the same day
    • Work in the order infection control sets

    Source: Northlight's survey (Lecture theatre, 12 Sep 2026, Sam Okafor): a clinical education building, in use during the day. Fenwater Health: Above-ceiling permit with infection control, issued 25 Sep

    Before Medium · 3 × 4After Low · 1 × 4
  7. H7Trips over cable, cuts from tray edges

    Cable pulled across floors and through tray and ceiling grid with sharp edges.

    Who might be harmed
    The crew; Patients, staff and visitors
    Controls
    • Cable pulled in one run and dressed away at once
    • Gloves when handling tray and ceiling grid
    • Offcuts and packaging cleared as the work goes

    Source: Task: run and terminate cable (Listed on the job, 1 × Cat 6A cable, 305 m box)

    Before Medium · 3 × 2After Low · 1 × 2

Method statement

  1. Before the visit. This RAMS approved and briefed to the crew; badges, induction and access confirmed; kit reserved and loaded.
  2. Arrive and sign in. Sign in with Fenwater Health's site contact; agree the work area and any times to avoid. (H5)
  3. Set up the work area. Barriers and signs round the area; floor protection where kit is moved. (H5)
  4. Run the cable. From the platform at 6.2 m; dressed away as it goes; ceiling tiles back the same day. (H1, H6, H7)
  5. Fit the ceiling microphones. From the platform, with a ground person; tiles and grid handled with gloves. (H1, H2, H6)
  6. Patch in the comms room. Only the job's ports; fire stopping checked and photographed before leaving. (H4)
  7. Configure and test. Each unit set up from its setup guide; the room test run and recorded on the job.
  8. Clear up and hand back. Waste and packaging removed; the area handed back to the site contact; the as-built recorded on the job.

Personal protective equipment

  • Safety boots
  • Gloves
  • Eye protection when drilling
  • Dust mask when drilling or in the ceiling void
  • Harness and lanyard on the platform

Emergency arrangements

  • First aider on the crew: Ava Morales
  • Internal emergency line 2222 from any hospital phone; fire assembly point in car park B
  • Emergency services: 911
  • Report any incident to Fenwater Health's site contact and to Northlight's safety lead the same day

Competence: the crew's certifications

  • Working at height, everyone on the visitWork above 2 m. In date on Wed 30 Sep.
  • IPAF, at least one personA mobile platform for the 6.2 m ceiling. In date on Wed 30 Sep.
  • CTS, at least one personConfigure and test to the setup guides. In date on Wed 30 Sep.

Certifications from Northlight's crew record (Ava Morales, Leo Hart), checked on the last day of the work. 9 kinds are tracked, from CTS to site safety cards.

Review and sign-off

PreparedGenerated from the record24 Sep 2026, 15:40 · from the space, the job's tasks and the crew's certifications
Reviewed and approvedSam Okafor24 Sep 2026, 16:10
  • Reviewer's note: Bring the tall ladder as a spare for the side aisles (crew note, 26 Sep).
Briefed toRoleSignatureDate
Ava MoralesResident technician
Leo HartInstaller

A provider's own Keia

This is Northlight AV's own operations

Stock, orders, crews and safety paperwork are Northlight AV's own records. They never flow to a client: a client sees only the visit readiness and the handover packs its engagement shares. To see them, pick Sam Okafor (Northlight AV) in View as.

See Aigna's engagement with Northlight AV

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About RAMS: Swap the lecture theatre microphones

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.