Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

RAMS · NL-2305Simulated

Quarterly preventive maintenance

2 hazards · highest after controls: Low · approved by Sam Okafor

RAMS NL-2305: Quarterly preventive maintenance

Demo template. A demo template, not professional safety advice. A competent person must check every RAMS against the site, the work and the law where it happens before anyone relies on it.

Generated from the record, reviewed by Sam Okafor

Client
Quillmark Publishing
Site
Denver head office, Boardroom and meeting rooms
When
Thu 1 Oct
Crew
Tessa Quinn
For
QM-PM-Q4 · visit ready
Generated
25 Sep 2026, 09:00

The work, and what the record says

  • Preventive maintenance · Listed on the job
  • Northlight's survey (Boardroom and meeting rooms, 8 Jul 2026, Tessa Quinn): ceiling 2.8 m
  • Northlight's survey (Boardroom and meeting rooms, 8 Jul 2026, Tessa Quinn): suspended ceiling, podium steps
  • Northlight's survey (Boardroom and meeting rooms, 8 Jul 2026, Tessa Quinn): a working office

Risk after controls

Likelihood up, 1 rare to 5 almost certainSeverity across, 1 to 5

Low, 1 to 4Medium, 5 to 12High, 15 and above

Before controls: 0 high, 2 medium, 0 low.

Hazards and controls

  1. H1Working in an occupied space

    A working office: staff and visitors pass close to the work.

    Who might be harmed
    Staff and visitors
    Controls
    • Barriers and signs round the work area
    • Noisy work and drilling booked with the site contact, out of hours where possible
    • Corridors and doors kept clear; cables never left across a walkway

    Source: Northlight's survey (Boardroom and meeting rooms, 8 Jul 2026, Tessa Quinn): a working office

    Before Medium · 3 × 3After Low · 1 × 3
  2. H2Working alone

    One person on the visit: no one to raise the alarm after a fall or a shock.

    Who might be harmed
    The crew member
    Controls
    • Check-in calls with Northlight at arrival, midday and departure
    • The client's site contact knows where the work is
    • No work at height alone

    Source: The visit books one person

    Before Medium · 2 × 4After Low · 1 × 4

Method statement

  1. Before the visit. This RAMS approved and briefed to the crew; badges, induction and access confirmed; kit reserved and loaded.
  2. Arrive and sign in. Sign in with Quillmark Publishing's site contact; agree the work area and any times to avoid. (H1)
  3. Set up the work area. Barriers and signs round the area; floor protection where kit is moved. (H1)
  4. Maintenance round. Each room checked to the maintenance list; worn cables swapped from the van.
  5. Clear up and hand back. Waste and packaging removed; the area handed back to the site contact; the as-built recorded on the job.

Personal protective equipment

  • Safety boots

Emergency arrangements

  • No first aider on the crew: use the site's first aiders, named at induction
  • The site's fire alarm, assembly point and first aiders: confirmed at induction (not in the record)
  • Emergency services: 911
  • Report any incident to Quillmark Publishing's site contact and to Northlight's safety lead the same day

Competence: the crew's certifications

The work needs no certification beyond the site's own induction.

Certifications from Northlight's crew record (Tessa Quinn), checked on the last day of the work. 9 kinds are tracked, from CTS to site safety cards.

Review and sign-off

PreparedGenerated from the record25 Sep 2026, 09:00 · from the space, the job's tasks and the crew's certifications
Reviewed and approvedSam Okafor25 Sep 2026, 09:30
Briefed toRoleSignatureDate
Tessa QuinnInstaller

A provider's own Keia

This is Northlight AV's own operations

Stock, orders, crews and safety paperwork are Northlight AV's own records. They never flow to a client: a client sees only the visit readiness and the handover packs its engagement shares. To see them, pick Sam Okafor (Northlight AV) in View as.

See Aigna's engagement with Northlight AV

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About RAMS: Quarterly preventive maintenance

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.