Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

RAMS · NL-2310Simulated

Add a camera to telehealth room 2

6 hazards · highest after controls: Medium · approved by Sam Okafor

RAMS NL-2310: Add a camera to telehealth room 2

Demo template. A demo template, not professional safety advice. A competent person must check every RAMS against the site, the work and the law where it happens before anyone relies on it.

Generated from the record, reviewed by Sam Okafor

Client
Fenwater Health
Site
Quincy outpatient centre, Telehealth room 2
When
Tue 6 Oct
Crew
Ava Morales
For
FW-REQ-0880 · visit at risk
Generated
28 Sep 2026, 08:10

The work, and what the record says

  • Run and terminate cable · Listed on the job, 1 × Poly Studio E60
  • Wall-mount a camera or video bar · 1 × Poly Studio E60, 1 × Camera wall bracket
  • Northlight's survey (Telehealth room 2, 22 Sep 2026, Ava Morales): ceiling 2.6 m
  • Northlight's survey (Telehealth room 2, 22 Sep 2026, Ava Morales): suspended ceiling tiles, reached from podium steps
  • Northlight's survey (Telehealth room 2, 22 Sep 2026, Ava Morales): an outpatient centre with patients in the corridor
  • Fenwater Health: Above-ceiling permit with infection control, issued 28 Sep

Risk after controls

Likelihood up, 1 rare to 5 almost certainSeverity across, 1 to 5

Low, 1 to 4Medium, 5 to 12High, 15 and above

Before controls: 1 high, 5 medium, 0 low.

Hazards and controls

  1. H1Working at height

    Work above 2 m: cable through the ceiling at 2.6 m.

    Who might be harmed
    The crew; Patients, staff and visitors below (dropped tools)
    Controls
    • Podium steps with guard rails; a leaning ladder only for short access
    • Only people with in-date working at height training work above 2 m
    • The area below kept clear with barriers and a sign
    • Tools on lanyards; nothing loose on the platform

    Source: Northlight's survey (Telehealth room 2, 22 Sep 2026, Ava Morales): ceiling 2.6 m

    Before High · 3 × 5After Medium · 1 × 5
  2. H2Hidden cables and pipes when drilling

    Fixings for mounts and brackets go into walls or ceilings that may hide power cables or pipes.

    Who might be harmed
    The crew; Patients, staff and visitors
    Controls
    • A cable and pipe detector over every fixing point before drilling
    • Fixings only where the client's drawings or the site contact confirm it is clear
    • Stop and report anything unexpected

    Source: Tasks: wall-mount a camera or video bar (1 × Poly Studio E60, 1 × Camera wall bracket)

    Before Medium · 2 × 4After Low · 1 × 4
  3. H3Working near patients

    An outpatient centre with patients in the corridor: patients, staff and visitors pass close to the work.

    Who might be harmed
    Patients, staff and visitors
    Controls
    • Barriers and signs round the work area
    • Noisy work and drilling booked with the site contact, out of hours where possible
    • Corridors and doors kept clear; cables never left across a walkway

    Source: Northlight's survey (Telehealth room 2, 22 Sep 2026, Ava Morales): an outpatient centre with patients in the corridor

    Before Medium · 3 × 3After Low · 1 × 3
  4. H4Dust from the ceiling void

    Opening ceiling tiles near clinical areas can release dust and spores.

    Who might be harmed
    Patients; Staff
    Controls
    • The client's above-ceiling permit with infection control, before any tile is lifted
    • Dust sheets and a HEPA vacuum; tiles back the same day
    • Work in the order infection control sets

    Source: Northlight's survey (Telehealth room 2, 22 Sep 2026, Ava Morales): an outpatient centre with patients in the corridor. Fenwater Health: Above-ceiling permit with infection control, issued 28 Sep

    Before Medium · 3 × 4After Low · 1 × 4
  5. H5Trips over cable, cuts from tray edges

    Cable pulled across floors and through tray and ceiling grid with sharp edges.

    Who might be harmed
    The crew; Patients, staff and visitors
    Controls
    • Cable pulled in one run and dressed away at once
    • Gloves when handling tray and ceiling grid
    • Offcuts and packaging cleared as the work goes

    Source: Task: run and terminate cable (Listed on the job, 1 × Poly Studio E60)

    Before Medium · 3 × 2After Low · 1 × 2
  6. H6Working alone

    One person on the visit: no one to raise the alarm after a fall or a shock.

    Who might be harmed
    The crew member
    Controls
    • Check-in calls with Northlight at arrival, midday and departure
    • The client's site contact knows where the work is
    • No work at height alone

    Source: The visit books one person

    Before Medium · 2 × 4After Low · 1 × 4

Method statement

  1. Before the visit. This RAMS approved and briefed to the crew; badges, induction and access confirmed; kit reserved and loaded.
  2. Arrive and sign in. Sign in with Fenwater Health's site contact; agree the work area and any times to avoid. (H3)
  3. Set up the work area. Barriers and signs round the area; floor protection where kit is moved. (H3)
  4. Run the cable. From podium steps at 2.6 m; dressed away as it goes; ceiling tiles back the same day. (H1, H4, H5)
  5. Mount the kit. Detector over each fixing point, then the mount; the display lifted on by two people and locked. (H2)
  6. Configure and test. Each unit set up from its setup guide; the room test run and recorded on the job.
  7. Clear up and hand back. Waste and packaging removed; the area handed back to the site contact; the as-built recorded on the job.

Personal protective equipment

  • Safety boots
  • Gloves
  • Eye protection when drilling
  • Dust mask when drilling or in the ceiling void

Emergency arrangements

  • First aider on the crew: Ava Morales
  • Clinic reception calls 911; fire assembly point at the front car park
  • Emergency services: 911
  • Report any incident to Fenwater Health's site contact and to Northlight's safety lead the same day

Competence: the crew's certifications

  • Working at height, everyone on the visitWork above 2 m. In date on Tue 6 Oct.
  • CTS, at least one personConfigure and test to the setup guides. In date on Tue 6 Oct.

Certifications from Northlight's crew record (Ava Morales), checked on the last day of the work. 9 kinds are tracked, from CTS to site safety cards.

Review and sign-off

PreparedGenerated from the record28 Sep 2026, 08:10 · from the space, the job's tasks and the crew's certifications
Reviewed and approvedSam Okafor28 Sep 2026, 08:40
Briefed toRoleSignatureDate
Ava MoralesResident technician

A provider's own Keia

This is Northlight AV's own operations

Stock, orders, crews and safety paperwork are Northlight AV's own records. They never flow to a client: a client sees only the visit readiness and the handover packs its engagement shares. To see them, pick Sam Okafor (Northlight AV) in View as.

See Aigna's engagement with Northlight AV

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About RAMS: Add a camera to telehealth room 2

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.