Viewing as , ,
Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationJob · Design reviewDSGN-15-01SimulatedBrightwave jobs · BW-7713 · 11:58
Design review: the divisible town hall
Due Tue 20 Oct, 14:00 · 1 day 2 h leftchecked just now
- Tue 20 Oct, 14:00Due
- 1 day 2 hLeft on the clock
- 2Things you can open
This job is not handed to your company
A partner opens only the jobs handed to them. Your jobs are on your Home.
Go to your HomeYou are Aigna staff: this is the job as Brightwave Integration sees it, through the link they were sent.
No single unit on this job
- Space
- 3.04 Curlew, Dublin office
- IP address and switch port
- Not shared with partners
- Who booked the space
- Not shared with partners
Floor planNot shared with partners. The job needs the space, not the floor.
The job
- Why
- Return the design review with the microphone plan
- The contract clock
- Due Tue 20 Oct, 14:00 · 1 day 2 h leftDesign review returned, from AG-INT-2024-11. The same clock on both sides; waiting on Aigna stops it.
- Status
- With Brightwave Integration · Brightwave jobs: In review Brightwave jobs · BW-7713 · 11:58
- Handed over
- Thu 15 Oct, 14:00, by Anna Byrne
Timeline
Nothing recorded on this job yet beyond the hand-off.