Decision 0011Accepted

Wiring templates and installed devices

Accepted 27 Sept 2026 · in force

0011. Wiring templates and installed devices

  • Status: Accepted
  • Date: 2026-09-27

Context

Each space type option says what equipment a space holds and which power and data outlets it needs. To show wiring and lifecycle, Keia Atlas also needs to know how the equipment connects, port to port, and which physical units are installed where. Writing every cable by hand for 176 spaces would be thousands of lines and easy to get wrong.

Decision

Wiring templates. Each build option carries its wiring once: a list of cables, each from one endpoint to another, with a cable type. An endpoint is a port on an equipment line (video-bar.hdmi-out-1, hdbaset-rx#2.usb-b-1), a numbered outlet (outlet:data/behind-display#2), the person’s laptop, or the home-router. Optional kit uses when and unless, so the laptop picture runs through the scaler only when the whiteboard kit is fitted. Every space built to that option inherits the wiring.

The published guideline gives outlet assignments, not a port-by-port plan, so port-level wiring is Keia Atlas’s engineering reading of it.

The validator checks every cable: the key exists, the port exists on that model, the cable type fits the connector, the outlet exists in the option, and no port or outlet is used twice, both with all optional kit fitted and with none.

Installed devices. Each space has an install file, following Keia’s split between logical and physical identity:

  • a position is the role (the video bar in Curlew): its model and hostname stay the same when hardware is replaced;
  • a unit is one physical box, with a made-up serial (always DEMO-), an asset tag, a Keia lifecycle stage (plan, procure, deploy, manage, retire) and an install date.

During a replacement a position has two units: the outgoing one, marked legacy and in the retire stage, and the new one. The validator checks that each space’s positions match its option (required kit, fitted optional kit, repeated desks and kits), that each position has one current unit, and that serials, asset tags and hostnames are unique.

Consequences

  • 370 cables across the templates and 1,164 installed units, all checked.
  • Juneau is shown mid fit-out (stage deploy), and one HQ room shows a live video bar replacement.
  • Personal assigned desks and reception security devices are not tracked by unit: the first are each person’s own kit, and the second have no named models.

Source: Keia: Operations Framework, logical and physical device identity.

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About 0011 Wiring templates and installed devices

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.