Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Batch 7 of 7 · Project PRJ-09Simulated live
5 displays
All 5 units set up · nothing to reviewchecked just now
Setup is done by Aigna's engineers. Your installs are on the Deploy page.
Nothing shared to set
Nothing to set on these: once they are provisioned and installed, they are ready for the room test.
The units
Only what differs per unit. Each unit's build sheet has every setting worked out.Nothing is ready for you here. Keia Atlas keeps checking these units.
| Unit | Hostname | Provision | Install | |
|---|---|---|---|---|
| Build sheet | lon-201-dsp0110.30.2.44 | |||
| Build sheet | lon-201-dsp0210.30.2.45 | |||
| Build sheet | lon-202-dsp0110.30.2.50 | |||
| Build sheet | lon-203-dsp0110.30.2.76 | |||
| Build sheet | lon-203-dsp0210.30.2.77 | |||