Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Support is switched off

Incidents and every piece of open work, with who has it. This demo has the Support module switched off in Organisation settings.

Organisation settings

Standing rule · NetworkSimulated

PoE rule

Every run read back and matchedchecked just now

Runs, one square each

oldest on the left

4 runs · 1 unable to complete

  • Done automatically, read back and matched
  • Unable to complete
  • Put back by a person

Done automatically 09:30, 17 Oct · Cycled PoE on port GE1/0/4 after the patch lead was replaced; the video bar answered after 41 s ·

Checked before every run

In this order; the first that fails stops the run before it touches anything
  1. 1No meeting in the space now, and none in the next 10 minutes
  2. 2The switch port is up and the device draws no power, or answers no ping
  3. 3Not in a change freeze
  4. 4No other run of this rule on the same switch in the last 30 minutes
Record

How a run goes

Read, write, read back: a write that does not read back as intended is Unable to complete
  1. ReadRead the port, its PoE draw and the device's last contact1 s
  2. WriteTurn PoE off on the port, wait 10 s, turn it on12 s
  3. WaitWait for the device to start40 s
  4. Read backRead back: the port draws power and the device answers2 s
  5. ThenDone automatically, or Unable to complete, with nothing left changed

What it reads

  • Switch port state and PoE draw (the room switch's management interface)
  • The device's last contact (device management)
  • Bookings for the space (room booking)

What it rules out

  • A meeting in the space (none until the next booking)
  • The switch itself being down (its other ports answer)

What it does not check

  • Whether the cable between the switch and the device is damaged (a cycle cannot tell)
  • Why the device lost power in the first place

Runs

Newest first
  1. Done automatically · cph-407-vc01, port GE1/0/4Cycled PoE on port GE1/0/4 after the patch lead was replaced; the video bar answered after 41 s09:30, 17 Octby Tom Ashby
  2. Unable to complete · cph-407-vc01, port GE1/0/4The port drew power again but the video bar did not answer within 90 s. The port is on, as before.14:05, 15 Octby Tom Ashby
  3. Done automatically · nyc-2010-tc01, port GE1/0/7Cycled PoE on port GE1/0/7; the touch controller answered after 29 s08:12, 10 Octby Carlos Mendes
  4. Done automatically · lon-203-vc01, port GE1/0/5Cycled PoE on port GE1/0/5; the video bar answered after 38 s10:41, 3 Octby Tom Ashby

Incidents

Raised by a run, or offered this rule on their Do section
Video bar offline before the 09:00INC0041210 · P2 (booked in 68 min) · New
Raw

Raw

The audit log for this rule

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About PoE rule

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.