Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Support is switched off
Incidents and every piece of open work, with who has it. This demo has the Support module switched off in Organisation settings.
IncidentINC0041195ResolvedMajor incident · commander Yusuf DemirOn call: Arjun Rao until Monday 08:00SimulatedServiceNow · INC0041195 · 08:40
Nothing in Heron works this morning
Resolved at 08:40 · 8.03 back for the 09:00 (12 people)checked just now
- 45 minTook
- 0Hand-offs
- 09:00Booking, 12 people
- New12 Oct, 07:55 · Chloe Barker10 min
- In progress12 Oct, 08:05 · Ruby Chen35 min
- Resolved12 Oct, 08:40 · Ruby ChenFixed
Response target 15 min · taken in 10 min
8.03 Heron
Large meeting room · the whole spaceSpace pageDrawn to scale · 4.60 × 9.70 m, 44.6 m² · 16 seats · Outlets: Type I sockets; Australian plates, 116 × 76 mm; floor boxes with a 300 mm lid · Table 6.0 × 1.4 m (house choice)
Timeline
Every event: who, what, when and where it came from- 12 Oct
Ruby Chen Resolved, fixed: Facilities reset the breaker for the display wall circuit, tripped during Saturday's electrical testing. Every device came back; the room's verification passed.
ServiceNow · INC0041195
Ruby Chen Took it: Everything at once points to power, not the devices. Asked facilities about the weekend's electrical testing.
ServiceNow · INC0041195
Keia Atlas Declared a major incident: Every device in the space dark before a leadership meeting. Commander: Yusuf Demir
rule: Match tickets to spaces (Priya) Matched to 8.03 Heron at the Melbourne office. Monitoring: the display, video bar, touch controller and booking panel all went offline at 06:12 on Saturday, at the same second. ·
Chloe Barker Came in: Called the service desk.
ServiceNow · INC0041195
Keia Atlas Proposed P2: leadership meeting booked in 65 min
Nothing of this kind on the record yet.
Wiring
9 signal cables, 10 to outletsHover a device to light its path.
List every cable
| Cable | From | To |
|---|---|---|
| HDMI | Video bar, hdmi-out-1 | Display, hdmi-in-1 |
| Cat 6 | Display, lan-1 | Data outlet 1, behind the display |
| Cat 6 | Video bar, lan-1 | Data outlet 2, behind the display |
| Cat 6 | Touch controller, lan-1 | Data outlet 1, below the table |
| Cat 6A | HDBaseT transmitter, hdbaset-1 | HDBaseT receiver at the display, hdbaset-1In direct cable run 1, floor box to display wall. The receiver powers the transmitter over this cable. |
| USB-C | HDBaseT transmitter, usb-c-1 | LaptopThe table cable people plug their laptop into |
| HDMI | HDBaseT receiver at the display, hdmi-out-1 | Scaler for the whiteboard camera picture, hdmi-in-1 |
| HDMI | Scaler for the whiteboard camera picture, hdmi-out-1 | Video bar, hdmi-in-1 |
| HDMI | USB to HDMI converter for the whiteboard camera, hdmi-out-1 | Scaler for the whiteboard camera picture, hdmi-in-2 |
| Vendor cable | Whiteboard camera, lan-1 | USB to HDMI converter for the whiteboard camera, usb-a-1Up the marker board wall in trunking, along the ceiling to the display wall and down to the camera power box and dongle behind the display |
| USB | HDBaseT receiver at the display, usb-b-1 | Video bar, usb-c-1Laptop USB through to the video bar, for device mode |
| Poly microphone | Microphone, mic-1 | Video bar, mic-1Over direct cable run 2, with the extension kit |
| Cat 6 | Scheduler panel, lan-1 | Data outlet 1, at the door |
| Power | Display, power-in | Power outlet 1, behind the display |
| Power | HDBaseT receiver at the display, power-in | Power outlet 2, behind the display |
| Power | HDBaseT transmitter, power-in | Power outlet 1, below the tableOptional: the transmitter can also run on power from the receiver |
| Power | Video bar, power-in | Power outlet 3, behind the display |
| Power | Scaler for the whiteboard camera picture, power-in | Power outlet 4, behind the display |
| Power | USB to HDMI converter for the whiteboard camera, power-in | Power outlet 5, behind the display |
In ServiceNow
- Number
- INC0041195
- Opened
- 12 Oct 2026, 07:55
- Caller
- Chloe Barker
- Priority
- 2, high
- Proposed priority
- 2, high (leadership meeting booked in 65 min), not changed
- State
- Resolved
- Assignment group
- AV and IT, Asia Pacific
- Assigned to
- Ruby Chen
- Short description
- Nothing in Heron works this morning
- Description
- The screen, the video bar and the panel by the door are all dark. Leadership meeting in the room at 09:00.
- Resolution code
- Fixed
- Resolution notes
- Facilities reset the breaker for the display wall circuit, tripped during Saturday's electrical testing. Every device came back; the room's verification passed.
Added by Keia Atlas
- About
- The whole space, 8.03 Heron
- Where
- 8.03 Heron, Melbourne office, Melbourne
- Service
- AV · owner Sofia Reyes
- Response target
- 15 min, every minute counts
- Booking at risk
- 09:00, 12 people
- Major incident
- Commander Yusuf Demir, since 12 Oct, 07:58
- Matched by
- The ticket names Heron at the Melbourne office and says everything is dark.