Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Assets is switched off

Device types, units, models, setup guides, standards, IT stores and cables. This demo has the Assets module switched off in Organisation settings.

Organisation settings

HaldenAV switcher device type

MS-42 VGA Matrix Switcher

1 unit in service · 1 past planned life · firmware support ended 2016

What it is for

An older aV switcher from before today's standard. It is kept on record because one is still installed and due for replacement.

Simulated: a made-up model standing in for an older product.

Installed by year

060711

Ports

11 ports
VGA64 in, 2 out3.5 mm21 in, 1 outDB91RJ451IEC C1411 in

Rear

1. vga-in-1: VGA, in12. vga-in-2: VGA, in23. vga-in-3: VGA, in34. vga-in-4: VGA, in45. vga-out-1: VGA, out56. vga-out-2: VGA, out67. audio-in-1: 3.5 mm, in78. audio-out-1: 3.5 mm, out89. serial-1: DB9, bidirectional910. lan-1: RJ45, bidirectional1011. power-in: IEC C14, in11
VideoAudioOtherNetworkPower
Every port, in detail
#PortConnectorCarriesDirectionWhere
1vga-in-1VGAvideoInRear
2vga-in-2VGAvideoInRear
3vga-in-3VGAvideoInRear
4vga-in-4VGAvideoInRear
5vga-out-1VGAvideoOutRear
6vga-out-2VGAvideoOutRear
7audio-in-13.5 mmaudioInRear
8audio-out-13.5 mmaudioOutRear
9serial-1DB9rs232Both waysRear
10lan-1RJ45ethernetBoth waysRear
11power-inIEC C14powerInRear

Spaces using it

1 space

DUB 3.04 Curlew

What the manufacturer doesn't say

  • Size, weight and power draw are not recorded: this is a stand-in, not a real product.

Sources

Each model was read twice, independently, and the two readings reconciled against the manufacturer's text.

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About Halden MS-42 VGA Matrix Switcher

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.