Statement of work · OPP-2613 · version 1, draft

Quincy telehealth rooms

For
Fenwater Health, Quincy outpatient centre
By
Northlight AV
Dated
26 Sep 2026
Quote
Version 1, $14,417.50

A demo document: every name, price and date in it is made up.

1Scope, room by room

From The design, version 1: each space's type and build option, with the changes the quote lists

1.12 Telehealth room 1

Focus room, desk and chair

  • 1 × Dell Pro P 27 USB-C Hub Conferencing Monitor (P2726DEB)

1.13 Telehealth room 2

Focus room, desk and chair

  • 1 × Dell Pro P 34 USB-C Hub Conferencing Monitor (P3426WEB)

1.14 Telehealth room 3

Focus room, desk and chair

  • 1 × Dell Pro P 27 USB-C Hub Conferencing Monitor (P2726DEB)

1.15 Telehealth room 4

Focus room, desk and chair

  • 1 × Dell Pro P 27 USB-C Hub Conferencing Monitor (P2726DEB)

1.20 Family meeting room

Small meeting room, single display

  • 1 × Samsung QM65C
  • 1 × Poly Studio X52
  • 1 × Poly TC10
  • 1 × Kramer EXT3-C-XR-T (HDBaseT transmitter)
  • 1 × Kramer EXT3-POE-XR-R (HDBaseT receiver at the display)

2Deliverables

From Northlight's standard deliverables, counted from the design

  • 9 units supplied, installed and set up across 5 rooms.
  • A build sheet for each of the 9 units that has a setup guide, with every setting worked out for its room.
  • An as-built record in Fenwater Health's Keia: the serial, MAC address and a photo of each position, sent as a reviewed change.
  • The room test result for each room, and a handover Fenwater Health accepts room by room.

3Assumptions

From Northlight's standard terms, and the outlets each space type lists

  • Focus room, desk and chair (1.12, 1.13, 1.14, 1.15): 2 power outlets and 2 data outlets in place in each room before the install day, as the space type lists them.
  • Small meeting room, single display (1.20): 8 power outlets, 7 data outlets and 5 direct cable runs in place in each room before the install day, as the space type lists them.
  • Work happens in normal hours, Monday to Friday, 08:00 to 17:00, with access to each room for a full day.
  • Walls and ceilings take the mounts named in the design without extra fixings or making good.
  • Existing cable containment can be reused; new containment is quoted separately.

4Exclusions

From Northlight's standard terms

  • Building works, electrical works and new cable containment.
  • Network changes beyond reserving addresses and patching the ports the design names.
  • Meeting platform licences, which the client buys and assigns.
  • Removing and disposing of the old kit, unless an option says so.

5What Fenwater Health does

From Northlight's standard terms, and the engagement (fenwater-northlight)

  • Reserve an address and a switch port for every networked unit before the install day; the client's floor plans, addresses and switch ports never leave its Keia, so its team fills them in on the job.
  • Buy and assign a meeting platform licence for each room system.
  • Give access to every room on the booked days, and a named person to accept each room.

6Acceptance criteria

From Keia's verification: each model's setup guide and each space type's room test

  • Each unit is read back against its setup guide: Dell Pro P conferencing monitor hub (P2726DEB / P3426WEB) (4 units); QMC display for meeting rooms and signage (1 unit); Studio X in Google Meet mode (1 unit); TC10 paired to its room system (1 unit); EXT3 extender pair (2 units).
  • Each room test passes: every required device in the chosen option is recorded in the space and wired as the option says; every device has an active record in this space; every networked device has an address reservation and DNS records; meeting devices are online, paired and on standard firmware; the room resource exists with the right capacity and is linked to its devices.
  • A room that fails is not accepted until it passes; an accepted snag has an owner and a date.

7Timeline

From The labour estimate (22.5 h) and Northlight's lead time, in working days from acceptance

StepWorking daysWorked out from
Order and deliver the kitDays 1 to 20Northlight's lead time
Install 9 units (2 installers)Day 21The install hours
Configure each unit to its setup guideDay 22The configure hours
Test 5 rooms and hand overDay 23The commission hours

8Change control

From Northlight's standard terms

  • Any change to the scope is a new version of the quote, with the difference from the last one shown line by line.
  • Once accepted, a change reaches the client's Keia as a reviewed change to the project, never as an edit.

9Price and payment

From The quote, version 1, and Northlight's standard terms

PaymentShareAmount
On acceptance40%$5,767
When the kit is on site50%$7,208.75
When the client accepts the handover10%$1,441.75
Total100%$14,417.50
  • Workmanship for 12 months from handover; equipment under each manufacturer's own warranty, handled by Northlight.
  • Prices are in US dollars and exclude sales tax.

Accepted for Fenwater Health

Name, date

For Northlight AV

Name, date

Provider sales is switched off in Settings. Your clients, jobs and visits are still under Your clients.

A provider's own Keia

This is Northlight AV's sales

A provider keeps its opportunities, designs, quotes and margins in its own Keia. None of it reaches a client until a quote is accepted, and then only the design, as a proposal. To see it, pick one of its people in View as (Sam Okafor, Northlight AV).

See Aigna's engagement with Northlight AV

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About Quincy telehealth rooms: statement of work

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.