Viewing as , ,
Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-0901Review · Closed phasePRJ-09 London office meeting room refreshDoneSimulated
Pull the units past their years in service
Done · 2 steps completechecked just now
- 3 MarWas due 3 Mar
- 3 hEstimate
- 2/2Steps done
What to do
The phase is done when: Lessons captured.
The spaces
- 2.01 KestrelMedium meeting room
- 2.02 HeronSmall meeting room
- 2.03 CurlewHybrid meeting room
Assign to
How it closed
Nothing new: the guide was rightClosing needs a fix or a reason. The reasons show how good the guides are.