Swap the video bar in Heron
Done · 5 steps completechecked just now
- 27 MayWas due 27 May
- 5 hEstimate
- 5/5Steps done
What to do
From the AV refresh playbook, Deploy phase: "When a vendor does the swap: record serial and MAC for each position, with a label photo".
The phase is done when: Every space in the batch installed; Every space passes, or its snags are accepted.
The space
- 2.02 HeronSmall meeting room