Task T-0911Review · Closed phasePRJ-09 London office meeting room refreshDoneSimulated
Feed what was learned back into the playbook
Done · 2 steps completechecked just now
- 10 JulWas due 10 Jul
- 2 hEstimate
- 2/2Steps done
What to do
From the AV refresh playbook, Closed phase: "Feed what was learned back into this playbook".
The phase is done when: Lessons captured.
The spaces
- 2.01 KestrelMedium meeting room
- 2.02 HeronSmall meeting room
- 2.03 CurlewHybrid meeting room
Assign to
How it closed
Nothing new: a one-offClosing needs a fix or a reason. The reasons show how good the guides are.