Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-0910Hand over · Hand over phasePRJ-09 London office meeting room refreshDoneSimulated
Hand over to the service desk
Done · 3 steps completechecked just now
- 3 JulWas due 3 Jul
- 3 hEstimate
- 3/3Steps done
What to do
From the AV refresh playbook, Hand over phase: "Handover note to the service desk", which produces: Handover note.
The phase is done when: Records match what is in the spaces.
The spaces
- 2.01 KestrelMedium meeting room
- 2.02 HeronSmall meeting room
- 2.03 CurlewHybrid meeting room
Assign to