Keia Atlas · Work report
Bring AV ports live on the floor switch
DoneGenerated 19 Oct 2026
- Task
- T-1004 Bring AV ports live on the floor switch
- Project
- PRJ-10 Chicago office hybrid rooms
- Office
- Chicago office
- Kind of work
- Procure phase, network work
- Space
- Whole project
- Done by
- Marco Bianchi, Network engineer
- Due
- 22 Jul 2026
- Estimate
- 4 h
- Closed with the phase
- Procure phase ended 22 Jul 2026
What was done
Bring AV ports live on the floor switch. Nothing new: not device related.
Steps followed
- Send the MAC addresses to the network team before the units ship (their queue is five working days).
- Ask for address reservations and forward and reverse DNS records, named with each hostname.
- Confirm the switch ports are on the AV VLAN with enough power over Ethernet.
- Check each reservation resolves before install day.
Who
- Marco BianchiNetwork engineer4 h estimatedAV VLAN ports
Devices installed or changed
| Space | Position | Model | Serial | Asset tag | Note |
|---|---|---|---|---|---|
| 12.08 Barn Owl | In-room network switchchi-1208-sw01 | Netgear AV Line M4250-9G1F-PoE+ (GSM4210PD) | DEMO-CHI-000046 | AG-000046 |
Evidence
- Closing note: Nothing new: not device related
- Recorded for the Procure phase: Purchase order
- Recorded for the Procure phase: Serials on arrival
Deviations and added tasks
No deviations recorded.
Sign-off
- Procure gate: signed off by David Okoro, 22 Jul 2026
- Task closed
Done byMarco BianchiSignatureDate
Project managerDavid OkoroSignatureDate