Keia Atlas · Work report
Swap the video bar in Kestrel
DoneGenerated 19 Oct 2026
- Task
- T-1305 Swap the video bar in Kestrel
- Project
- PRJ-13 Toronto office video bar refresh
- Office
- Toronto office
- Kind of work
- Deploy phase, install work
- Space
- 7.01 Kestrel
- Done by
- Grace Kim, Technician
- Due
- 15 Oct 2026
- Estimate
- 5 h
- Closed with the phase
- Phase still open
What was done
Swap the video bar in Kestrel. Nothing new: the guide was right.
Steps followed
- Book the space out for the time the install needs.
- Check the firmware on the unit against the standard. Newer than the standard? Don't update or roll back: use Report, New firmware found.
- Mount each device where the space type puts it, and connect it as the wiring shows.
- Power on and check each device takes its reserved address.
- Keep the position and hostname; retire any old unit in the asset register the same day.
Who
- Grace KimTechnician5 h estimatedSwapped Kestrel and recorded the serials; travelled from Chicago
Devices installed or changed
| Space | Position | Model | Serial | Asset tag | Note |
|---|---|---|---|---|---|
| 7.01 Kestrel | Video bartor-701-vc01 | Poly Studio X52Standard firmware 4.6.2.460046 | DEMO-TOR-001387 | AG-001387 |
Evidence
- Closing note: Nothing new: the guide was right
Deviations and added tasks
No deviations recorded.
Sign-off
- Task closed
Done byGrace KimSignatureDate
Project managerDavid OkoroSignatureDate