Viewing as , ,
Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1309Hand over · Hand over phasePRJ-13 Toronto office video bar refreshTo doSimulated
Hand over
To do · due in 39 dayschecked just now
- 27 NovDue in 39 days
- 3 hEstimate
- 0/3Steps done
What to do
The phase is done when: Records match what is in the spaces.
The spaces
- 7.01 KestrelMedium meeting room
- 7.02 HeronSmall meeting room
- 7.03 CurlewHybrid meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.