Project PRJ-17AV refreshCopenhagen officeSimulated
Copenhagen office meeting room refresh
Plan gate due 30 Oct · 4 open tasks, none waitingchecked just now
Timeline
12 Oct to 18 Jun, following the AV refresh playbook, version 1.4PlannedActualPast the planGate, filled when signed off
Plan: what happened
Open, due 30 Oct
Collecting units due and a budget line for the Q2 review.
Tasks in this phase
Pull the units past their years in serviceAnna Byrne · DoingConfirm the current standard model for each positionSofia Reyes · To doBudget line for the Q2 planning reviewTomás Varga · To doGroup rooms into batches around the year-end freezeKatya Novak · To doThe gate, signed off by Programme manager
- Scope and budget agreed
- Batches fit the year plan
What the playbook says: 4 steps
- AV and IT delivery engineerPull the units past their years in service from the refresh plan
- Service manager, AVConfirm the current standard model for each position
- Project managerGroup spaces into batches that avoid busy weeks
- Programme managerBudget line and purchase request
Design: what happened
Not reached yet. Planned to end 4 Dec (the playbook allows 1 to 2 weeks).
Tasks in this phase
None recorded.
The gate, signed off by Service manager, AV
- Every swap is to the current standard
- No change to space types or wiring
What the playbook says: 3 steps
- AV and IT delivery engineerSwap sheet per space: position, old model, new model, hostname kept
- AV and IT delivery engineerCheck mounts, cables and power suit the new model
- AV and IT delivery engineerTake the configuration from the new model's configuration page
Procure: what happened
Not reached yet. Planned to end 18 Mar (the playbook allows 3 to 6 weeks).
Tasks in this phase
None recorded.
The gate, signed off by Project manager
- Everything received
- Addresses reserved
What the playbook says: 3 steps
- Project managerOrder units, mounts and one spare per ten
- Network engineerSend MACs to the network team for address reservations before delivery
- On-site technicianRecord serials on arrival against the swap sheet
Deploy: what happened
Not reached yet. Planned to end 10 Apr (the playbook allows Half a day per space, then 1).
Tasks in this phase
None recorded.
The gate, signed off by AV and IT delivery engineer
- Every space in the batch installed
- Every space passes, or its snags are accepted
What the playbook says: 9 steps
- On-site technician · ProvisionRetire the old unit in the asset register the same day
- Integration vendor · ProvisionWhen a vendor does the swap: record serial and MAC for each position, with a label photo
- Project manager · InstallBook the space out
- On-site technician · InstallSwap the unit, keeping position and hostname
- AV and IT delivery engineer · ConfigureConfigure each device in its setup order, then set and verify its settings
- AV and IT delivery engineer · CommissionRun the verification for each space
- On-site technician · CommissionTest call on the room's meeting platform
- AV and IT delivery engineer · CommissionSnag list
- Integration vendor · CommissionWhen a vendor did the swap: fix snags on their work within five working days
Hand over: what happened
Not reached yet. Planned to end 3 May (the playbook allows 1 weeks).
Tasks in this phase
None recorded.
The gate, signed off by Service manager, AV
- Records match what is in the spaces
What the playbook says: 2 steps
- Project managerHandover note to the service desk
- Project managerRedeploy or dispose of the old units
Closed: what happened
Not reached yet. Planned to end 18 Jun (the playbook allows - weeks).
Tasks in this phase
None recorded.
The gate, signed off by Programme manager
- Lessons captured
What the playbook says: 1 step
- Project managerFeed what was learned back into this playbook
Spaces
People and time
Budget
DKK 84,000approved
- Spent
- DKK 0
- Ordered, not yet paid
- DKK 0
- Still an estimate
- DKK 84,000
- Left if all goes to plan
- DKK 0
To do3
Doing1
Waiting on0
Done0
Archived tasks 0
Assign to
Risks (might happen), issues (have happened), decisions and dependencies, in one place. Open first.
No risks, issues, decisions or dependencies on record for this project.
A change to what the project delivers. Anyone on the project can propose one; the approver decides, and the log keeps who and when.
No change requests. The scope is as chartered.
Agents only propose; a person accepts a proposal as a task before anything changes. What the agents do