Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Projects is switched off

Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.

Organisation settings

Work reportDoneSimulated

Work report: List every AV device's port and VLAN

Complete · no differences from the planchecked just now

Back to the task

Keia Atlas · Work report

List every AV device's port and VLAN

DoneGenerated 19 Oct 2026

Task
T-1901 List every AV device's port and VLAN
Project
PRJ-19 Melbourne office IDF switch refresh
Office
Melbourne office
Kind of work
Design phase, design work
Space
Whole project
Done by
Mei Tan, Engineer
Due
11 Sept 2026
Estimate
6 h
Closed with the phase
Design phase ended 17 Sept 2026

What was done

List every AV device's port and VLAN. Nothing new: the guide was right.

Steps followed

  1. Choose the build option for each space from its space type.
  2. Write the swap sheet: position, old model, new model, hostname kept.
  3. Check mounts, cable lengths and power suit the new model (its ports are on the model page).
  4. List each networked device with its port and VLAN for the network team.
  5. Ask the service manager for design sign-off.

Who

  • Mei TanEngineer6 h estimatedLists every AV port and VLAN

Devices installed or changed

No devices were installed or changed by this work.

Evidence

  • Closing note: Nothing new: the guide was right
  • Recorded for the Design phase: Port map

Deviations and added tasks

No deviations recorded.

Sign-off

  • Design gate: signed off by Declan Moore, 17 Sept 2026
  • Task closed
Done byMei TanSignatureDate
Project managerHana MoriSignatureDate

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About T-1901 List every AV device's port and VLAN

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.