Viewing as , ,
Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1003Order · Procure phasePRJ-10 Chicago office hybrid roomsDoneSimulated
Order cameras, microphones and cables
Done · 3 steps completechecked just now
- 26 JunWas due 26 Jun
- 2 hEstimate
- 3/3Steps done
What to do
The phase is done when: Everything ordered.
The spaces
- 12.08 Barn OwlHybrid meeting room
- 13.01 OystercatcherMedium meeting room
Assign to
How it closed
Nothing new: not device relatedClosing needs a fix or a reason. The reasons show how good the guides are.