Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1002Design · Design phasePRJ-10 Chicago office hybrid roomsDoneSimulated
Draft the design and signal routes
Done · 5 steps completechecked just now
- 19 JunWas due 19 Jun
- 16 hEstimate
- 5/5Steps done
What to do
From the Custom room design playbook, Design phase: "Custom design and signal routes", which produces: Design.
The phase is done when: Design signed off; Lab tests passed.
The spaces
- 12.08 Barn OwlHybrid meeting room
- 13.01 OystercatcherMedium meeting room
Assign to