Task T-1006Install · Deploy phasePRJ-10 Chicago office hybrid roomsDoneSimulated
Install cameras and ceiling microphones in Oystercatcher
Done · 5 steps completechecked just now
- 17 SeptWas due 17 Sept
- 10 hEstimate
- 5/5Steps done
What to do
From the Custom room design playbook, Deploy phase: "Vendor tunes microphones and cameras with the delivery engineer on a test call".
The phase is done when: Installed to the design; Every mode passes.
The space
- 13.01 OystercatcherMedium meeting room