Viewing as , ,
Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Build sheetBatch 2 of 3Project PRJ-12Simulated live
nyc-2005-tc01
Every value recorded · 4 settings to set, 1 to checkchecked just now
Switch port
Network controller › Ports- VLAN (native, untagged)Network controller › Ports
The network standard: VLAN by purpose30 Room systemsSetEvery unitNot checked - PortNetwork controller › Ports
The port it is patched to (simulated)nyc-2005-sw01 port 10CheckThis unitNot checked
Pairing
Room system's web interface- PairRoom system's web interface › General Settings › Device Management › Available Devices
Curlew video bar. As written: The TC10 with this space's MAC address.What it pairs with in 20.05 Curlewnyc-2005-vc01SetThis unitNot read back yet - NetworkRoom system's web interface
The setup guide, the same on every unitPoE port on the room system's subnetSetEvery unitNot read back yet - Admin passwordRoom system's web interface
The setup guide, the same on every unitSynced from the room systemSetEvery unitNot read back yet
No setting matches these filters.