Project PRJ-12AV refreshNew York officeSimulated
New York office video bar refresh
Deploy gate due 20 Nov · 1 task waiting on somethingchecked just now
Timeline
24 Aug to 18 Dec, following the AV refresh playbook, version 1.4PlannedActualPast the planGate, filled when signed off
Plan: what happened
Ended 2 Sept2 days early
Scope agreed: three X72 rooms first, four X52s to follow next quarter.
Handed onScope and budget lineList of units past their years in service
Gate signed off by Tomás Varga, 2 Sept
Tasks in this phase
Confirm which X72s are dueAnna Byrne · DoneThe gate, signed off by Programme manager
- Scope and budget agreed
- Batches fit the year plan
What the playbook says: 4 steps
- AV and IT delivery engineerPull the units past their years in service from the refresh plan
- Service manager, AVConfirm the current standard model for each position
- Project managerGroup spaces into batches that avoid busy weeks
- Programme managerBudget line and purchase request
Design: what happened
Ended 17 Sept1 days early
Like-for-like swap to the current standard; no change to space types or wiring.
Handed onRoom-by-room swap sheetConfirmed standard model
Gate signed off by Sofia Reyes, 17 Sept
Tasks in this phase
None recorded.
The gate, signed off by Service manager, AV
- Every swap is to the current standard
- No change to space types or wiring
What the playbook says: 3 steps
- AV and IT delivery engineerSwap sheet per space: position, old model, new model, hostname kept
- AV and IT delivery engineerCheck mounts, cables and power suit the new model
- AV and IT delivery engineerTake the configuration from the new model's configuration page
Procure: what happened
Ended 13 Oct4 days late
Units and mounts arrived four days late; addresses reserved before delivery.
Handed onPurchase orderDelivery note with serialsAddress reservations
Gate signed off by Ruth Kelly, 13 Oct
Tasks in this phase
Order replacement units and mountsTomás Varga · DoneReserve addresses for new units on the 20th floorMarco Bianchi · Done · fix capturedThe gate, signed off by Project manager
- Everything received
- Addresses reserved
What the playbook says: 3 steps
- Project managerOrder units, mounts and one spare per ten
- Network engineerSend MACs to the network team for address reservations before delivery
- On-site technicianRecord serials on arrival against the swap sheet
Deploy: what happened
Open, due 20 Nov
One room under way; Whooper Swan blocked by a board meeting.
- InstallDue 20 Nov
Tasks in this phase
Install the new video bar in CurlewCarlos Mendes · DoingCommission Curlew and run the verificationAnna Byrne · To doSwap the X72 in Whooper SwanCarlos Mendes · Waiting onSwap the X72 in SkylarkElena Vasquez · To doProvision Curlew's new video bar: asset record, DNS, device management and monitoringAnna Byrne · DoingConfigure Curlew's video bar in its setup orderCarlos Mendes · To doProvision the Skylark replacement before it is unboxedAnna Byrne · To doRecord serials and MACs for the Whooper Swan and Skylark unitsElena Vasquez · To doThe gate, signed off by AV and IT delivery engineer
- Every space in the batch installed
- Every space passes, or its snags are accepted
What the playbook says: 9 steps
- On-site technician · ProvisionRetire the old unit in the asset register the same day
- Integration vendor · ProvisionWhen a vendor does the swap: record serial and MAC for each position, with a label photo
- Project manager · InstallBook the space out
- On-site technician · InstallSwap the unit, keeping position and hostname
- AV and IT delivery engineer · ConfigureConfigure each device in its setup order, then set and verify its settings
- AV and IT delivery engineer · CommissionRun the verification for each space
- On-site technician · CommissionTest call on the room's meeting platform
- AV and IT delivery engineer · CommissionSnag list
- Integration vendor · CommissionWhen a vendor did the swap: fix snags on their work within five working days
Hand over: what happened
Not reached yet. Planned to end 29 Nov (the playbook allows 1 weeks).
Tasks in this phase
Hand over with a snag listRuth Kelly · To doThe gate, signed off by Service manager, AV
- Records match what is in the spaces
What the playbook says: 2 steps
- Project managerHandover note to the service desk
- Project managerRedeploy or dispose of the old units
Closed: what happened
Not reached yet. Planned to end 18 Dec (the playbook allows - weeks).
Tasks in this phase
None recorded.
The gate, signed off by Programme manager
- Lessons captured
What the playbook says: 1 step
- Project managerFeed what was learned back into this playbook
Spaces
People and time
Budget
US$68,000approved
- Spent
- US$31,300
- Ordered, not yet paid
- US$9,800
- Still an estimate
- US$14,200
- Left if all goes to plan
- US$12,700
To do6
Doing2
Waiting on1
Archived tasks 0
Assign to
Risks (might happen), issues (have happened), decisions and dependencies, in one place. Open first: 3 open.
A change to what the project delivers. Anyone on the project can propose one; the approver decides, and the log keeps who and when. 1 request waiting.
Agents only propose; a person accepts a proposal as a task before anything changes. What the agents do