Work reportDoneSimulated

Work report: Build the comms room and bring switch ports live

Complete · no differences from the planchecked just now

Back to the task

Keia Atlas · Work report

Build the comms room and bring switch ports live

DoneGenerated 19 Oct 2026

Task
T-1402 Build the comms room and bring switch ports live
Project
PRJ-14 Juneau office fit-out
Office
Juneau office
Kind of work
Deploy phase, network work
Space
Whole project
Done by
Marco Bianchi, Network engineer
Due
4 Sept 2026
Estimate
40 h
Closed with the phase
Phase still open

What was done

Build the comms room and bring switch ports live. Nothing new: not device related.

Steps followed

  1. Send the MAC addresses to the network team before the units ship (their queue is five working days).
  2. Ask for address reservations and forward and reverse DNS records, named with each hostname.
  3. Confirm the switch ports are on the AV VLAN with enough power over Ethernet.
  4. Check each reservation resolves before install day.

Who

  • Marco BianchiNetwork engineer40 h estimatedBuilds the comms room, switches, VLANs and address plan

Devices installed or changed

No devices were installed or changed by this work.

Evidence

  • Closing note: Nothing new: not device related
  • Recorded for the Deploy phase: Vendor install records
  • Recorded for the Deploy phase: As-built cable schedule
  • Recorded for the Deploy phase: Photos per position

Deviations and added tasks

No deviations recorded.

Sign-off

  • Task closed
Done byMarco BianchiSignatureDate
Project managerRuth KellySignatureDate

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About T-1402 Build the comms room and bring switch ports live

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.