Task T-1402Network · Deploy phasePRJ-14 Juneau office fit-outDoneSimulated
Build the comms room and bring switch ports live
Done · 4 steps completechecked just now
- 4 SeptWas due 4 Sept
- 40 hEstimate
- 4/4Steps done
What to do
From the New office build playbook, Deploy phase: "Comms room built and switches live".
The phase is done when: Everything installed to the design; Vendor records checked; Every space passes, or its snags are accepted.
The spaces
- 2.02 HeronSmall meeting room
- 2.03 WrenHuddle room, small
- 2.04 Focus 2.04Focus room
- 2.05 Focus 2.05Focus room
- 2.06 Copy and printPrint room
- 2.07 Flex desks AHot desk