Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1410Configure · Deploy phasePRJ-14 Juneau office fit-outDoingSimulated
Configure Wren's devices in their setup order
Doing · due in 3 dayschecked just now
- 22 OctDue in 3 days
- 4 hEstimate
- 0/5Steps done
What to do
From the New office build playbook, Deploy phase: "Configure each device in its setup order, then set and verify its settings".
The phase is done when: Everything installed to the design; Vendor records checked; Every space passes, or its snags are accepted.
The space
- 2.03 WrenHuddle room, small
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.