Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1408Hand over · Hand over phasePRJ-14 Juneau office fit-outTo doSimulated
Handover pack to the service desk
To do · due in 18 dayschecked just now
- 6 NovDue in 18 days
- 6 hEstimate
- 0/3Steps done
What to do
From the New office build playbook, Hand over phase: "Handover pack to the service desk: spaces, devices, known errors", which produces: Handover pack.
The phase is done when: Service desk ready; Snags closed or owned.
The spaces
- 2.02 HeronSmall meeting room
- 2.03 WrenHuddle room, small
- 2.04 Focus 2.04Focus room
- 2.05 Focus 2.05Focus room
- 2.06 Copy and printPrint room
- 2.07 Flex desks AHot desk
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.