Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Build sheetBatch 6 of 12Project PRJ-19Simulated live
8.01 Reception av extender
Every value recorded · 2 settings to set, 5 to checkchecked just now
Asset register
Assetbox › Assets- Asset tagAssetbox › Assets
The install recordAG-000493CheckThis unitNot seen yet - Serial numberAssetbox › Assets
The install recordDEMO-MEL-000493CheckThis unitNot seen yet - ModelAssetbox › Assets
The space typeKramer WP-20CTCheckEvery unitNot seen yet - LocationAssetbox › Assets
The spaceMelbourne office, 8.01 ReceptionSetThis unitNot seen yet
Power
Rear panel terminal block- 12V/20V Power SupplyRear panel terminal block › Rear panel › 12V/20V Power Supply 2-pin terminal block
The setup guide, the same on every unitKramer 20V/6A supply (PS-2006-O)SetEvery unitConfirm by hand
RS-232
Rear panel terminal blocks- CONTROL RS-232 portRear panel terminal blocks
The setup guide, the same on every unit115200 baud, 8 data bits, 1 stop bit, no parity, ASCII commands (fixed)CheckEvery unitConfirm by hand - EXTD RS-232 portRear panel terminal blocks
The setup guide, the same on every unit300-115200 baud, bidirectional extension to the far end (fixed range, auto)CheckEvery unitConfirm by hand
No setting matches these filters.