Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1903Order · Procure phasePRJ-19 Melbourne office IDF switch refreshDoneSimulated
Order switches, optics and the console server
Done · 3 steps completechecked just now
- 2 OctWas due 2 Oct
- 2 hEstimate
- 3/3Steps done
What to do
From the Comms room refresh playbook, Procure phase: "Order switches, optics and patch leads".
The phase is done when: Everything received and pre-staged.
The spaces
- 8.01 ReceptionReception
- 8.03 HeronLarge meeting room
- 8.06 KestrelSmall meeting room
Assign to