Task T-1902Design · Design phasePRJ-19 Melbourne office IDF switch refreshDoneSimulated
Port map and cutover plan
Done · 5 steps completechecked just now
- 17 SeptWas due 17 Sept
- 12 hEstimate
- 5/5Steps done
What to do
From the Comms room refresh playbook, Design phase: "Port audit: what is on each port, its VLAN and power draw", which produces: Port audit.
The phase is done when: Port map and rollback plan approved; AV devices listed.