Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-2108Hand over · Hand over phasePRJ-21 Heron HDBaseT receiver RMATo doSimulated
Send the faulty receiver back to Kramer and keep the courier receipt
To do · due in 10 dayschecked just now
- 29 OctDue in 10 days
- 1 hEstimate
- 0/3Steps done
What to do
From the RMA playbook, Hand over phase: "Pack the faulty unit and send it back with the RMA number, and keep the courier receipt".
The phase is done when: Faulty unit on its way back; Incident resolved; Records match the space.
The space
- 12.03 HeronLarge meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.