Batch 1 of 16 · Project PRJ-22Simulated live

1 Netgear AV Line M4250-9G1F-PoE+ in-room network switch

0 of 1 unit set up · nothing to reviewchecked just now

Setup is done by Aigna's engineers. Your installs are on the Deploy page.

Once for all 1

Through Device web interface

Set on each unit by hand Device web interface. Keia Atlas cannot read these back, so a person confirms them.

6 settings to set and 2 to check; 0 left at the manufacturer's default.See every settingThe setup guide

The same on every unit

SNTP server
ntp1.aigna.example
Firmware update
Manual, downloaded from netgear.com/support/download and applied after the Lab passes it

The units

Only what differs per unit. Each unit's build sheet has every setting worked out.

Nothing is ready for you here. Keia Atlas keeps checking these units.

UnitHostnameProvisionInstallConfigure
Build sheetdub-303-sw0110.20.3.85

Setup order

Optional: tick as you go, or let the checks do it
  1. 1Mount the switch under the desk or on the wall and connect the out-of-band management port to the management VLAN.0/1
  2. 2Log in over HTTPS (no password is required on first login) and set the admin password.0/1
  3. 3Set the SNTP server for the switch's clock.0/1
  4. 4Apply the Network Profile that matches the space's AV-over-IP protocol, or leave Default if the space has none.0/1
  5. 5Assign each port's untagged/tagged/excluded status for that Network Profile and check its IGMP querier is enabled.0/1
  6. 6Set the PoE power allocation for the space's endpoints within the 110 W budget.0/1
  7. 7Leave automatic firmware checks off; update manually once the Lab has passed a release.0/1
  8. 8Run the space's verification.0/1

Every setting

8 in the setup guide, as patterns

Values marked Per unit are patterns here. Each unit's build sheet has them worked out: dub-303-sw01.

Management access2
  • Admin passwordPer unitSet to From the password vault, per siteWorked out on the build sheet
    Why

    No password is required on first login; Aigna sets one immediately, 8 to 64 characters with an uppercase letter, a lowercase letter and a number.

  • Management access protocolCheck it is HTTPS
    Why

    The switch defaults to HTTPS for its web interface, which Aigna keeps rather than allowing plain HTTP.

Date and time1
  • SNTP serverConfigure > Date and time settingsSet to ntp1.aigna.example
    Why

    Uses Aigna's time server instead of manual entry, so the switch's logs line up with everything else on the site.

Network Profiles (AV UI)3
  • Network ProfilePer unitConfigure > Network ProfilesSet to The Network Profile for the space's AV protocol (e.g. Dante, NDI or Kramer AV), Default if the space has noneWorked out on the build sheet
    Why

    Each preconfigured Network Profile carries its own VLAN separation and querier settings for that protocol; picking the wrong one can cut a device off from its controller.

  • Port assignment (untagged/tagged/excluded)Per unitConfigure > Network Profiles > [Network Profile] > portsSet to AV endpoints untagged on the Network Profile's VLAN; the uplink taggedWorked out on the build sheet
    Why

    Matches how the space's AV-over-IP protocol expects its VLAN to reach each device.

  • Querier Election ParticipateConfigure > Network Profiles > [Network Profile] > QuerierCheck it is On
    Why

    Already on by default for the Default Network Profile; a multicast AV stream needs a querier on its VLAN to keep flowing to every receiver.

Power over Ethernet1
  • PoE port power allocationPer unitConfigure > Power over EthernetSet to Per the connected device's power class, within the 110 W total budgetWorked out on the build sheet
    Why

    The 8 PoE+ ports share one 110 W budget; setting each port's allocation stops one device starving another when the space is full.

Updates1
  • Firmware updateManage and MonitorSet to Manual, downloaded from netgear.com/support/download and applied after the Lab passes it
    Why

    No automatic-update toggle is documented for this series; Aigna checks and applies a release by hand regardless.

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About PRJ-22 Poly VideoOS 4.7.0 rollout, 1 Netgear AV Line M4250-9G1F-PoE+ in-room network switch

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.