Project PRJ-22Firmware rolloutDublin officeSimulated
Poly VideoOS 4.7.0 rollout
Plan gate due 30 Oct · 12 open tasks, none waitingchecked just now
Timeline
12 Oct to 11 Dec, following the Firmware rollout playbook, version 1.0PlannedActualPast the planGate, filled when signed off
Plan: what happened
Not reached yet. Planned to end 30 Oct (the playbook allows 2 to 4 weeks).
Tasks in this phase
Read the 4.7.0 release notes and ADV-002 for the X52, X32 and TC10Anna Byrne · Done · fix capturedLab pass: every check in LAB-07 on the X52, X72, X32 and TC10, including a rollback to 4.6.2Nora Walsh · DoingDecide whether 4.7.0 becomes the standardSofia Reyes · To doChoose the pilot rooms and the waves by office, and avoid the year-end freezeKatya Novak · To doThe gate, signed off by Service manager, AV
- Lab test passed
- Version approved as the standard
- Pilot spaces and waves agreed
What the playbook says: 5 steps
- AV and IT delivery engineerRead the release notes and the advisories for every model that runs this firmware
- Innovation engineerLab pass: every check on every model, including a rollback
- Service manager, AVDecide whether the version becomes the standard
- AV and IT delivery engineerCount the units per site and choose the pilot spaces, one of each space type
- Project managerPick the waves by office and avoid busy weeks and change freezes
Deploy: what happened
Not reached yet. Planned to end 23 Nov (the playbook allows 2 to 6 weeks).
Tasks in this phase
Tell the Dublin and Copenhagen offices the day and time of their wavesKatya Novak · To doUpdate Heron (pilot) to 4.7.0Liam Doyle · To doUpdate Gannet (pilot) to 4.7.0Liam Doyle · To doReboot Heron and check its camera source, then run the verification for both pilot roomsAnna Byrne · To doUpdate Kestrel (wave 1) to 4.7.0Liam Doyle · To doUpdate Heron at the Copenhagen office (wave 2) to 4.7.0Tom Ashby · To doUpdate Curlew at the Copenhagen office (wave 2) to 4.7.0Tom Ashby · To doThe gate, signed off by AV and IT delivery engineer and Service manager, AV
- Pilot spaces passed
- Every wave updated
- Every unit reports the target version
What the playbook says: 10 steps
- AV and IT delivery engineer · ProvisionPut the target version in the configuration, and check updates are still off in device management
- Project manager · ProvisionTell each site the day and time of its wave
- On-site technician · InstallUpdate the pilot spaces and leave them a week
- On-site technician · InstallUpdate each wave, one site at a time
- AV and IT delivery engineer · InstallUpdate remotely where device management can do it, and on site where it cannot
- AV and IT delivery engineer · ConfigureCheck each unit's settings survived the update, and fix any that did not
- AV and IT delivery engineer · CommissionRun the space verification for every pilot space, and for a sample in each wave
- AV and IT delivery engineer · CommissionCheck the points the advisories name, such as the camera after a reboot
- Service manager, AV · CommissionRead the pilot report and decide whether to continue, pause or roll back
- On-site technician · CommissionRoll back a space if it fails, and raise an incident for the fault
Hand over: what happened
Not reached yet. Planned to end 29 Nov (the playbook allows 1 weeks).
Tasks in this phase
Set 4.7.0 as the standard on the firmware line and the model pagesSofia Reyes · To doHandover note to the service desk: what changed and which symptoms to expectKatya Novak · To doThe gate, signed off by Service manager, AV
- The standard matches what is in the spaces
What the playbook says: 2 steps
- Service manager, AVSet the firmware line's standard version and update the model pages
- Project managerTell the service desk what changed and which symptoms to expect
Closed: what happened
Not reached yet. Planned to end 11 Dec (the playbook allows - weeks).
Tasks in this phase
None recorded.
The gate, signed off by Programme manager
- Lessons captured
What the playbook says: 1 step
- Project managerFeed what was learned back into this playbook and the model pages
Spaces
People and time
Budget
€4,000approved
- Spent
- €0
- Ordered, not yet paid
- €0
- Still an estimate
- €3,000
- Left if all goes to plan
- €1,000
To do11
Doing1
Waiting on0
Archived tasks 0
Assign to
Risks (might happen), issues (have happened), decisions and dependencies, in one place. Open first.
No risks, issues, decisions or dependencies on record for this project.
A change to what the project delivers. Anyone on the project can propose one; the approver decides, and the log keeps who and when.
No change requests. The scope is as chartered.