Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-2201Review · Plan phasePRJ-22 Poly VideoOS 4.7.0 rolloutDoneSimulated
Read the 4.7.0 release notes and ADV-002 for the X52, X32 and TC10
Done · 2 steps completechecked just now
- 14 OctWas due 14 Oct
- 3 hEstimate
- 2/2Steps done
What to do
From the Firmware rollout playbook, Plan phase: "Read the release notes and the advisories for every model that runs this firmware", which produces: Known errors list.
The phase is done when: Lab test passed; Version approved as the standard; Pilot spaces and waves agreed.
The spaces
- 3.03 HeronLarge meeting room
- 3.05 GannetMedium meeting room
- 3.06 KestrelMedium meeting room
- 4.03 HeronMedium meeting room
- 4.04 CurlewMedium meeting room
Assign to
How it closed
"ADV-002 is about 4.7.0 itself, so the camera check after a reboot goes into every pilot room's verification."
Anna Byrne · now in the guide for the next install