Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-2213Hand over · Hand over phasePRJ-22 Poly VideoOS 4.7.0 rolloutTo doSimulated
Handover note to the service desk: what changed and which symptoms to expect
To do · due in 53 dayschecked just now
- 11 DecDue in 53 days
- 1 hEstimate
- 0/3Steps done
What to do
From the Firmware rollout playbook, Hand over phase: "Tell the service desk what changed and which symptoms to expect", which produces: Handover note.
The phase is done when: The standard matches what is in the spaces.
The spaces
- 3.03 HeronLarge meeting room
- 3.05 GannetMedium meeting room
- 3.06 KestrelMedium meeting room
- 4.03 HeronMedium meeting room
- 4.04 CurlewMedium meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.