Out of service
Who was told Simulated from the booking system
Notes from the team
Drawn to scale · 2.44 × 2.29 m, 5.57 m² · 1 seat · Outlets: Type A, B sockets; a desk module, 52 mm a socket (house default) · Desk 60 × 30 in
Compared against
Desk and chair: A desk with a monitor that has a built-in camera and dock.
- Required devices
- All recorded
- Wiring
- Checks pass
Lifecycle
- Being installed
- 1
Accessibility
Live captions and step-free access
- Hearing loop
- None in this room
- Live captions
- On in calls, from the touch panel
- Step-free access
- Yes
- Last walked through
- 15 Sep 2026, by facilities, Juneau office, with the Toronto AV technician
From the office's accessibility record (demo), the same one the room guide reads to people in the room.
Cable tests
Restricted: rack and switch portsAll 2 links passed certification · closest margin 3.8 dB · last tested 24 Aug 2026
| Link | Outlet | Cable | Length | Result | Margin | Tested |
|---|---|---|---|---|---|---|
| JNU-2.08-R1-U14-P10 | On the desk, 1 | Cat6A | 32.57 m | Pass | 4.58 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P30 | On the desk, 2 | Cat6A | 32.41 m | Pass | 3.84 dB | 24 Aug 2026 |
From the cabling contractor's certification report, recorded on each run (made up for the demo). A margin under 3 dB passes but is worth a look.
Room guide and QR
What people in the space seeThe code on the table opens this space's guide: how to start a meeting and share a screen, and a two-tap way to report a problem or ask for something.
Sent from the guide
Nothing sent from this space's guide yet. Reports appear here, on the Incidents board and on Home as they arrive.
Outlets
For this space| Service | Where | How many | Serves | Provided by |
|---|---|---|---|---|
| Data | On the desk | 2 | monitor, spareOnly one of the two is patched to a switch port. | IT |
| Power | On the desk | 2 | monitor, spare | IT |
Wiring
1 signal cable, 2 to outletsList every cable
| Cable | From | To |
|---|---|---|
| USB-C | Monitor, usb-c-1 | LaptopOne cable: picture, network and charging |
| Cat 6 | Monitor, lan-1 | Data outlet 1, on the desk |
| Power | Monitor, power-in | Power outlet 1, on the desk |
Notes
- Juneau is being fitted out: devices are installed but not yet commissioned.