Project PRJ-11UpgradeSingapore officeSimulated

Singapore office booking panels

Deploy gate due 23 Oct · 1 task waiting on somethingchecked just now

ScheduleSlipped, now on planProcure ended 5 days late. Deploy is due 23 Oct.
CostSGD 2,300 in handSGD 17,200 spent or ordered of SGD 21,000 approved, SGD 1,500 still estimated.
ScopeAs chartered5 spaces, upgrade; no change requests.
Next gateDeploy gatedue 23 OctAV and IT delivery engineer signs it off. Installed to the design. Every mode passes.

Timeline

22 Jun to 20 Nov, following the Custom room design playbook, version 1.1

PlannedActualPast the planGate, filled when signed off

The Deploy board35 devices in 5 spaces, each through four steps. Tick each device's checklist, or hand it to the agent.0/35Provision35/35Install18/28Configure35/35CommissionOpen Deploy

Deploy: what happened

Open, due 23 Oct

All five mounted and on power over Ethernet. Three of five rooms pass; two show yesterday's meetings until the calendar resource is fixed.

Handed onInstall record

  • InstallEnded 1 Oct, signed off by Mei Tan
  • CommissionDue 23 Oct

The gate, signed off by AV and IT delivery engineer

  • Installed to the design
  • Every mode passes
What the playbook says: 6 steps
  1. Integration vendor · ProvisionVendor installs to the design; record serial and MAC for each position, with a label photo
  2. Project manager · InstallBuilding works
  3. On-site technician · InstallInstall to the design
  4. Integration vendor · ConfigureVendor tunes microphones and cameras with the delivery engineer on a test call
  5. AV and IT delivery engineer · CommissionVerification in every mode the room has
  6. Project manager · CommissionTrial week with the people who use it

Spaces

People and time

TVTomás VargaProgramme manager5 of 6 h · Approved it out of the Lab
HMHana MoriProject manager24 of 30 h · Dates, access and handover
MTMei TanLead engineer22 of 28 h · Configuration and commissioning
ARArjun RaoTechnician20 of 24 h · Mounting and wiring
MBMarco BianchiNetwork engineer4 of 4 h · Door outlets live
NWNora WalshLab testing4 of 4 h · Answers questions from the Lab test
SRSofia ReyesService owner (sign-off)2 of 3 h · Signs off the room booking setup
Everyone's hours on the capacity plan

Budget

SGD 21,000approved

Spent
SGD 10,800
Ordered, not yet paid
SGD 6,400
Still an estimate
SGD 1,500
Left if all goes to plan
SGD 2,300
Every project's budget
5 open of 11

Add a task

For work this project needs that the playbook does not list. It is added straight away, and you can undo it.

How should it count?

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About PRJ-11 Singapore office booking panels

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.