Task T-1110Provision · Deploy phasePRJ-11 Singapore office booking panelsDoingSimulated
Add the five panels to monitoring and check each one reports
Doing · due in 4 dayschecked just now
- 23 OctDue in 4 days
- 2 hEstimate
- 0/5Steps done
What to do
From the Custom room design playbook, Deploy phase: "Vendor installs to the design; record serial and MAC for each position, with a label photo".
The phase is done when: Installed to the design; Every mode passes.
The spaces
- 12.01 KestrelMedium meeting room
- 12.02 HeronSmall meeting room
- 12.03 CurlewHybrid meeting room
- 12.04 WrenHuddle room, sofa
- 12.05 RobinHuddle room, sofa
Assign to