Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Projects is switched off

Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.

Organisation settings

Build sheetBatch 7 of 9Project PRJ-17Simulated live

4.05 Gannet adapter

Every value recorded · 11 settings to set, 5 to checkchecked just now

Filters

Asset register

Assetbox › Assets
  1. Asset tagAssetbox › Assets

    AG-000192

    The install record
    CheckThis unit
    Not seen yet
  2. Serial numberAssetbox › Assets

    DEMO-CPH-000192

    The install record
    CheckThis unit
    Not seen yet
  3. ModelAssetbox › Assets

    Kramer VP-440H2

    The space type
    CheckEvery unit
    Not seen yet
  4. LocationAssetbox › Assets

    Copenhagen office, 4.05 Gannet

    The space
    SetThis unit
    Not seen yet

Network

Front panel OSD (Advanced › Ethernet) or Device Settings web page
  1. IP MODEFront panel OSD (Advanced › Ethernet) or Device Settings web page › Advanced › ETHERNET › IP MODE

    10.90.4.75

    Leave it on DHCP (DHCP, with a reservation on the AV VLAN). The reservation gives it this address.Its DHCP reservation (simulated address plan)
    SetThis unit
    Confirm by hand
  2. CONTROL PORTFront panel OSD (Advanced › Ethernet) or Device Settings web page › Advanced › ETHERNET › CONTROL PORT

    Kramer's default IP control port

    The setup guide, the same on every unit
    CheckEvery unit
    Confirm by hand

OSD and audio

Front panel OSD
  1. OSD DISPLAYFront panel OSD › OSD › DISPLAY

    INFO (shown for 10 seconds)

    The setup guide, the same on every unit
    SetEvery unit
    Confirm by hand
  2. MIC MODEFront panel OSD › Audio › MIC SETTINGS › MIC MODE

    OFF

    The setup guide, the same on every unit
    SetEvery unit
    Confirm by hand

Switching

Advanced menu (OSD) or Input Select web page
  1. AUTO-SYNC OFFAdvanced menu (OSD) or Input Select web page › Advanced › AUTO-SYNC OFF

    SLOW (about 2 minutes)

    The setup guide, the same on every unit
    SetEvery unit
    Confirm by hand
  2. AUTO SWITCHINGAdvanced menu (OSD) or Input Select web page › Advanced › AUTO SWITCHING

    Last connected

    The setup guide, the same on every unit
    SetEvery unit
    Confirm by hand

Security

Device Settings web page › Authentication
  1. Authenticate Web Pages accessDevice Settings web page › Authentication

    On

    The setup guide, the same on every unit
    SetEvery unit
    Confirm by hand
  2. Web pages user name and passwordDevice Settings web page › Authentication

    From the password vault, Copenhagen office / AV / Kramer VP-440H2 / Web pages user name and password

    The password vault. The secret itself is never shown here.
    SetThis unit
    Confirm by hand

Firmware

Device Settings web page
  1. Firmware update methodDevice Settings web page

    Manual upload only, no automatic-update toggle exists

    The setup guide, the same on every unit
    CheckEvery unit
    Confirm by hand

HDCP

HDCP web page (or Advanced › HDCP ON INPUT/OUTPUT on the OSD)
  1. HDCP on inputs (HDBT, HDMI1-3)HDCP web page (or Advanced › HDCP ON INPUT/OUTPUT on the OSD) › Advanced › HDCP ON INPUT

    ON for every input

    The setup guide, the same on every unit
    SetEvery unit
    Confirm by hand
  2. HDCP on outputs (HDMI OUT, HDBT OUT)HDCP web page (or Advanced › HDCP ON INPUT/OUTPUT on the OSD) › Advanced › HDCP ON OUTPUT

    Input (only encrypt the output when the active input is encrypted)

    The setup guide, the same on every unit
    SetEvery unit
    Confirm by hand

EDID

EDID web page (or Advanced › EDID MANAGE on the OSD)
  1. EDID source for each inputEDID web page (or Advanced › EDID MANAGE on the OSD) › Advanced › EDID MANAGE

    Copy the connected display's own EDID to every input

    The setup guide: the same instruction on every unit
    SetEvery unit
    Confirm by hand

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About Gannet adapter, build sheet (PRJ-17)

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.