Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Build sheetBatch 4 of 4Project PRJ-20Simulated live
Drogheda home office 2 monitor
Every value recorded · 3 settings to set, 5 to checkchecked just now
Asset register
Assetbox › Assets- Asset tagAssetbox › Assets
The install recordAG-001451CheckThis unitSeen - Serial numberAssetbox › Assets
The install recordDEMO-REM-001451CheckThis unitSeen - ModelAssetbox › Assets
The space typeDell Pro P 27 USB-C Hub Conferencing Monitor (P2726DEB)CheckEvery unitSeen - LocationAssetbox › Assets
The spaceRemote EMEA, Drogheda home office 2SetThis unitSeen
Input Source
Monitor OSD- Auto SelectMonitor OSD › Input Source › Auto Select
The setup guide, the same on every unitOn, with the option for USB-C set to Prompt for Multiple InputsSetEvery unitConfirm by hand - Reset Input SourceMonitor OSD › Input Source › Reset Input Source
The setup guide, the same on every unitRun once at installCheckEvery unitConfirm by hand
Personalize
Monitor OSD- USBMonitor OSD › Personalize › USB
The setup guide, the same on every unitOther USB Charging: On in standbySetEvery unitConfirm by hand
Others
Monitor OSD- DDC/CIMonitor OSD › Others › DDC/CI
The setup guide, the same on every unitOn (vendor default)CheckEvery unitConfirm by hand
No setting matches these filters.