Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Projects is switched off

Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.

Organisation settings

Build sheetBatch 4 of 4Project PRJ-20Simulated live

Malmö home office 3 monitor

Every value recorded · 3 settings to set, 5 to checkchecked just now

Filters

Asset register

Assetbox › Assets
  1. Asset tagAssetbox › Assets

    AG-001458

    The install record
    CheckThis unit
    Seen
  2. Serial numberAssetbox › Assets

    DEMO-REM-001458

    The install record
    CheckThis unit
    Seen
  3. ModelAssetbox › Assets

    Dell Pro P 27 USB-C Hub Conferencing Monitor (P2726DEB)

    The space type
    CheckEvery unit
    Seen
  4. LocationAssetbox › Assets

    Remote EMEA, Malmö home office 3

    The space
    SetThis unit
    Seen

Input Source

Monitor OSD
  1. Auto SelectMonitor OSD › Input Source › Auto Select

    On, with the option for USB-C set to Prompt for Multiple Inputs

    The setup guide, the same on every unit
    SetEvery unit
    Confirm by hand
  2. Reset Input SourceMonitor OSD › Input Source › Reset Input Source

    Run once at install

    The setup guide, the same on every unit
    CheckEvery unit
    Confirm by hand

Personalize

Monitor OSD
  1. USBMonitor OSD › Personalize › USB

    Other USB Charging: On in standby

    The setup guide, the same on every unit
    SetEvery unit
    Confirm by hand

Others

Monitor OSD
  1. DDC/CIMonitor OSD › Others › DDC/CI

    On (vendor default)

    The setup guide, the same on every unit
    CheckEvery unit
    Confirm by hand

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About Malmö home office 3 monitor, build sheet (PRJ-20)

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.