Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Projects is switched off

Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.

Organisation settings

Build sheetBatch 12 of 16Project PRJ-22Simulated live

3.03 Heron av extender

Every value recorded · 1 setting to set, 9 to checkchecked just now

Filters

Asset register

Assetbox › Assets
  1. Asset tagAssetbox › Assets

    AG-000292

    The install record
    CheckThis unit
    Not seen yet
  2. Serial numberAssetbox › Assets

    DEMO-DUB-000292

    The install record
    CheckThis unit
    Not seen yet
  3. ModelAssetbox › Assets

    Kramer TP-583TXR

    The space type
    CheckEvery unit
    Not seen yet
  4. LocationAssetbox › Assets

    Dublin office, 3.03 Heron

    The space
    SetThis unit
    Not seen yet

DIP-switches (both units)

Rear panel SETUP DIP-switches
  1. Set HDBT Range (DIP 1A)Rear panel SETUP DIP-switches › Rear panel › SETUP DIP-switches › 1A

    Off / up (HDBaseT normal range)

    The setup guide, the same on every unit
    CheckEvery unit
    Confirm by hand
  2. Set Compression Level, extended range (DIP 2A)Rear panel SETUP DIP-switches › Rear panel › SETUP DIP-switches › 2A

    Off / up (standard compression, EDID passthrough)

    The setup guide, the same on every unit
    CheckEvery unit
    Confirm by hand
  3. Define Compressed Resolutions (DIP 1B)Rear panel SETUP DIP-switches › Rear panel › SETUP DIP-switches › 1B

    Off / up (compress only above 1080p)

    The setup guide, the same on every unit
    CheckEvery unit
    Confirm by hand
  4. Define RS-232 Function (DIP 2B, 3B)Rear panel SETUP DIP-switches › Rear panel › SETUP DIP-switches › 2B, 3B

    Off, Off (embed RS-232 data and control signals over the extension line)

    The setup guide, the same on every unit
    CheckEvery unit
    Confirm by hand
  5. Define IR Pass-through (DIP 4B)Rear panel SETUP DIP-switches › Rear panel › SETUP DIP-switches › 4B

    Off / up (pass-through the IR signal to the IR port via IR cable)

    The setup guide, the same on every unit
    CheckEvery unit
    Confirm by hand

RS-232

Rear panel 3-pin terminal block
  1. Extended RS-232 baud rateRear panel 3-pin terminal block

    300-115200 baud, auto (not adjustable)

    The setup guide, the same on every unit
    CheckEvery unit
    Confirm by hand

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About Heron AV extender, build sheet (PRJ-22)

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.