Notes from the team
What's installed
8 devicesEach desk has
| Desk | Monitor | Stage |
|---|---|---|
| Desk 01 | DEMO-JNU-000483AG-000483 | Being installed |
| Desk 02 | DEMO-JNU-000484AG-000484 | Being installed |
| Desk 03 | DEMO-JNU-000485AG-000485 | Being installed |
| Desk 04 | DEMO-JNU-000486AG-000486 | Being installed |
| Desk 05 | DEMO-JNU-000487AG-000487 | Being installed |
| Desk 06 | DEMO-JNU-000488AG-000488 | Being installed |
| Desk 07 | DEMO-JNU-000489AG-000489 | Being installed |
| Desk 08 | DEMO-JNU-000490AG-000490 | Being installed |
Compared against
Single 27 inch: A 27 inch monitor with a built-in Thunderbolt 4 dock.
- Required devices
- All recorded
- Wiring
- Checks pass
Lifecycle
- Being installed
- 8
Cable tests
Restricted: rack and switch portsAll 16 links passed certification · closest margin 2.5 dB · last tested 24 Aug 2026
| Link | Outlet | Cable | Length | Result | Margin | Tested |
|---|---|---|---|---|---|---|
| JNU-2.08-R1-U14-P13 | Desk 01/data/table top#1 | Cat6A | 27.91 m | Pass | 4.07 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P14 | Desk 02/data/table top#1 | Cat6A | 29.52 m | Pass | 4.99 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P15 | Desk 03/data/table top#1 | Cat6A | 28.26 m | Pass | 3.07 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P16 | Desk 04/data/table top#1 | Cat6A | 29.57 m | Pass | 3.75 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P17 | Desk 05/data/table top#1 | Cat6A | 25.03 m | Pass | 4.42 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P18 | Desk 06/data/table top#1 | Cat6A | 26.3 m | Pass | 4.38 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P19 | Desk 07/data/table top#1 | Cat6A | 24.87 m | Pass | 5.27 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P20 | Desk 08/data/table top#1 | Cat6A | 26.43 m | Pass | 5.82 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P33 | Desk 01/data/table top#2 | Cat6A | 28.1 m | Pass | 5.63 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P34 | Desk 02/data/table top#2 | Cat6A | 29.79 m | Pass | 5.48 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P35 | Desk 03/data/table top#2 | Cat6A | 27.95 m | Pass | 4.55 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P36 | Desk 04/data/table top#2 | Cat6A | 29.68 m | Pass | 2.53 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P37 | Desk 05/data/table top#2 | Cat6A | 25.06 m | Pass | 5.45 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P38 | Desk 06/data/table top#2 | Cat6A | 26.49 m | Pass | 6.14 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P39 | Desk 07/data/table top#2 | Cat6A | 25.09 m | Pass | 3.47 dB | 24 Aug 2026 |
| JNU-2.08-R1-U14-P40 | Desk 08/data/table top#2 | Cat6A | 26.32 m | Pass | 4.61 dB | 24 Aug 2026 |
From the cabling contractor's certification report, recorded on each run (made up for the demo). A margin under 3 dB passes but is worth a look.
Outlets
Per desk| Service | Where | How many | Serves | Provided by |
|---|---|---|---|---|
| Power | On the desk | 4 | monitor or dock, spare, spare, spare | IT |
| Data | On the desk | 2 | monitor or dock, spareOnly one is patched to a switch port. | IT |
Wiring
1 signal cable, 2 to outletsThe same at every desk.
List every cable
| Cable | From | To |
|---|---|---|
| Thunderbolt | Monitor, usb-c-2 | LaptopOne cable: picture, network and charging |
| Cat 6 | Monitor, lan-1 | Data outlet 1, on the desk |
| Power | Monitor, power-in | Power outlet 1, on the desk |
Notes
- Juneau is being fitted out: devices are installed but not yet commissioned.