Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Locations is switched off

Regions, offices, floors and the spaces in them. This demo has the Locations module switched off in Organisation settings.

Organisation settings

DesksMELMelbourne office · Level 8In service

8.15 Flex desks A

All 24 units in service · no open incidentschecked just now

What's installed

24 devices
DeskMonitorStage
Desk 01DEMO-MEL-000557AG-000557In service
Desk 02DEMO-MEL-000558AG-000558In service
Desk 03DEMO-MEL-000559AG-000559In service
Desk 04DEMO-MEL-000560AG-000560In service
Desk 05DEMO-MEL-000561AG-000561In service
Desk 06DEMO-MEL-000562AG-000562In service
Desk 07DEMO-MEL-000563AG-000563In service
Desk 08DEMO-MEL-000564AG-000564In service
Desk 09DEMO-MEL-000565AG-000565In service
Desk 10DEMO-MEL-000566AG-000566In service
Desk 11DEMO-MEL-000567AG-000567In service
Desk 12DEMO-MEL-000568AG-000568In service
Desk 13DEMO-MEL-000569AG-000569In service
Desk 14DEMO-MEL-000570AG-000570In service
Desk 15DEMO-MEL-000571AG-000571In service
Desk 16DEMO-MEL-000572AG-000572In service
Desk 17DEMO-MEL-000573AG-000573In service
Desk 18DEMO-MEL-000574AG-000574In service
Desk 19DEMO-MEL-000575AG-000575In service
Desk 20DEMO-MEL-000576AG-000576In service
Desk 21DEMO-MEL-000577AG-000577In service
Desk 22DEMO-MEL-000578AG-000578In service
Desk 23DEMO-MEL-000579AG-000579In service
Desk 24DEMO-MEL-000580AG-000580In service

Incidents

No incidents recorded for this space.

All incidents at Melbourne office

Compared against

Hot desk

Single 27 inch: A 27 inch monitor with a built-in Thunderbolt 4 dock.

Required devices
All recorded
Wiring
Checks pass

Lifecycle

In service
24

Cable tests

Restricted: rack and switch ports

All 48 links passed certification · closest margin 2.5 dB · last tested 20 Aug 2019

LinkOutletCableLengthResultMarginTested
MEL-8.17-R1-U09-P27Desk 01/data/table top#1Cat6A29.81 mPass4.33 dB20 Aug 2019
MEL-8.17-R1-U09-P28Desk 01/data/table top#2Cat6A29.77 mPass5.57 dB20 Aug 2019
MEL-8.17-R1-U09-P29Desk 02/data/table top#1Cat6A31.54 mPass3.60 dB20 Aug 2019
MEL-8.17-R1-U09-P30Desk 02/data/table top#2Cat6A31.56 mPass6.23 dB20 Aug 2019
MEL-8.17-R1-U09-P31Desk 03/data/table top#1Cat6A33.06 mPass4.08 dB20 Aug 2019
MEL-8.17-R1-U09-P32Desk 03/data/table top#2Cat6A33.06 mPass6.15 dB20 Aug 2019
MEL-8.17-R1-U09-P33Desk 04/data/table top#1Cat6A29.86 mPass5.14 dB20 Aug 2019
MEL-8.17-R1-U09-P34Desk 04/data/table top#2Cat6A29.94 mPass4.64 dB20 Aug 2019
MEL-8.17-R1-U09-P35Desk 05/data/table top#1Cat6A31.22 mPass5.52 dB20 Aug 2019
MEL-8.17-R1-U09-P36Desk 05/data/table top#2Cat6A31.32 mPass5.64 dB20 Aug 2019
MEL-8.17-R1-U09-P37Desk 06/data/table top#1Cat6A32.81 mPass6.45 dB20 Aug 2019
MEL-8.17-R1-U09-P38Desk 06/data/table top#2Cat6A33.02 mPass4.34 dB20 Aug 2019
MEL-8.17-R1-U09-P39Desk 07/data/table top#1Cat6A26.45 mPass4.38 dB20 Aug 2019
MEL-8.17-R1-U09-P40Desk 07/data/table top#2Cat6A26.63 mPass6.19 dB20 Aug 2019
MEL-8.17-R1-U09-P41Desk 08/data/table top#1Cat6A28.17 mPass3.93 dB20 Aug 2019
MEL-8.17-R1-U09-P42Desk 08/data/table top#2Cat6A28.21 mPass5.64 dB20 Aug 2019
MEL-8.17-R1-U09-P43Desk 09/data/table top#1Cat6A29.55 mPass5.80 dB20 Aug 2019
MEL-8.17-R1-U12-P01Desk 09/data/table top#2Cat6A29.42 mPass3.22 dB20 Aug 2019
MEL-8.17-R1-U12-P02Desk 10/data/table top#1Cat6A26.31 mPass3.95 dB20 Aug 2019
MEL-8.17-R1-U12-P03Desk 10/data/table top#2Cat6A26.58 mPass2.75 dB20 Aug 2019
MEL-8.17-R1-U12-P04Desk 11/data/table top#1Cat6A27.82 mPass5.80 dB20 Aug 2019
MEL-8.17-R1-U12-P05Desk 11/data/table top#2Cat6A27.95 mPass3.17 dB20 Aug 2019
MEL-8.17-R1-U12-P06Desk 12/data/table top#1Cat6A29.55 mPass4.60 dB20 Aug 2019
MEL-8.17-R1-U12-P07Desk 12/data/table top#2Cat6A29.54 mPass5.37 dB20 Aug 2019
MEL-8.17-R1-U12-P08Desk 13/data/table top#1Cat6A24.37 mPass3.49 dB20 Aug 2019
MEL-8.17-R1-U12-P09Desk 13/data/table top#2Cat6A24.29 mPass3.71 dB20 Aug 2019
MEL-8.17-R1-U12-P10Desk 14/data/table top#1Cat6A25.92 mPass6.47 dB20 Aug 2019
MEL-8.17-R1-U12-P11Desk 14/data/table top#2Cat6A25.98 mPass6.09 dB20 Aug 2019
MEL-8.17-R1-U12-P12Desk 15/data/table top#1Cat6A27.24 mPass6.09 dB20 Aug 2019
MEL-8.17-R1-U12-P13Desk 15/data/table top#2Cat6A27.43 mPass4.80 dB20 Aug 2019
MEL-8.17-R1-U12-P14Desk 16/data/table top#1Cat6A24.42 mPass3.64 dB20 Aug 2019
MEL-8.17-R1-U12-P15Desk 16/data/table top#2Cat6A24.47 mPass5.21 dB20 Aug 2019
MEL-8.17-R1-U12-P16Desk 17/data/table top#1Cat6A25.86 mPass2.54 dB20 Aug 2019
MEL-8.17-R1-U12-P17Desk 17/data/table top#2Cat6A25.81 mPass3.33 dB20 Aug 2019
MEL-8.17-R1-U12-P18Desk 18/data/table top#1Cat6A27.32 mPass5.86 dB20 Aug 2019
MEL-8.17-R1-U12-P19Desk 18/data/table top#2Cat6A27.52 mPass5.50 dB20 Aug 2019
MEL-8.17-R1-U12-P20Desk 19/data/table top#1Cat6A21.12 mPass4.07 dB20 Aug 2019
MEL-8.17-R1-U12-P21Desk 19/data/table top#2Cat6A20.93 mPass5.96 dB20 Aug 2019
MEL-8.17-R1-U12-P22Desk 20/data/table top#1Cat6A22.59 mPass3.70 dB20 Aug 2019
MEL-8.17-R1-U12-P23Desk 20/data/table top#2Cat6A22.76 mPass4.27 dB20 Aug 2019
MEL-8.17-R1-U12-P24Desk 21/data/table top#1Cat6A24.21 mPass4.03 dB20 Aug 2019
MEL-8.17-R1-U12-P25Desk 21/data/table top#2Cat6A24.28 mPass6.18 dB20 Aug 2019
MEL-8.17-R1-U12-P26Desk 22/data/table top#1Cat6A21.11 mPass4.23 dB20 Aug 2019
MEL-8.17-R1-U12-P27Desk 22/data/table top#2Cat6A21.13 mPass4.90 dB20 Aug 2019
MEL-8.17-R1-U12-P28Desk 23/data/table top#1Cat6A22.63 mPass3.72 dB20 Aug 2019
MEL-8.17-R1-U12-P29Desk 23/data/table top#2Cat6A22.58 mPass6.10 dB20 Aug 2019
MEL-8.17-R1-U12-P30Desk 24/data/table top#1Cat6A24.15 mPass3.02 dB20 Aug 2019
MEL-8.17-R1-U12-P31Desk 24/data/table top#2Cat6A24.2 mPass6.38 dB20 Aug 2019

From the cabling contractor's certification report, recorded on each run (made up for the demo). A margin under 3 dB passes but is worth a look.

Outlets

Per desk
ServiceWhereHow manyServesProvided by
PowerOn the desk4monitor or dock, spare, spare, spareIT
DataOn the desk2monitor or dock, spareOnly one is patched to a switch port.IT

Wiring

1 signal cable, 2 to outlets
USB

The same at every desk.

Where it startsWhere it endsThunderbolt: Monitor, usb-c-2 to LaptopMonitor, Dell UltraSharp 27 Thunderbolt Hub Monitor (U2724DE)MonitorDell UltraSharp 27 Thunderbolt …usb-c-2 · USB-CNetwork, on the desk #1Network, on the desk #1Power, on the desk #1Power, on the desk #1Laptop, The person's ownLaptopThe person's owncable
List every cable
CableFromTo
ThunderboltMonitor, usb-c-2LaptopOne cable: picture, network and charging
Cat 6Monitor, lan-1Data outlet 1, on the desk
PowerMonitor, power-inPower outlet 1, on the desk

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About 8.15 Flex desks A, Melbourne office

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.