Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Assets is switched off

Device types, units, models, setup guides, standards, IT stores and cables. This demo has the Assets module switched off in Organisation settings.

Organisation settings

StandardRacks and comms roomsVersion 1.0

Racks and comms rooms

Version 1.0, in force since 1 Mar 2026 · 10 rules that must be met

  • +25%Port headroom
  • +20%PoE headroom
  • 25%Rack units kept free
  • 1 mClear in front

The must rules

10 rules every install follows, in the order of this page. 2 more rules are the default with a written exception.

There is no standard rack. The rack, the switches and the UPS are worked out from the rooms the comms room serves: count the outlets from the space types, add the access points and building systems, add headroom, then choose the kit. The worked example shows the sum. Keia Atlas's typical rack layouts are examples of the result, not templates.

  1. Sizing a rack from what it serves
  2. The rack itself
  3. The comms room

Sizing a rack from what it serves

4 rules

Work down this list for every comms room. Write the numbers in the design; Keia Atlas's rack layouts are drawn from them.

Ports: 202 needed, 253 with 25 percent headroom, 288 installed on 6 48-port switches. PoE: 1055 W needed, 1266 W with 20 percent headroom.Switch ports202 needed253 with headroom288 installedPoE budget1,055 W needed1,266 W to plan for
Desk and wall outletsMeeting room devicesWi-Fi access pointsBuilding systemsHeadroom
Worked example: a floor comms room serving 14 meeting rooms, 120 desks and 8 access points (made-up numbers)
WhatCounted fromPortsPoE budget
Desk and wall outletsSpace types' data outlets: 120 desks, 22 wall outlets1420 W (desks use their own power)
Meeting room devicesSpace types: 14 rooms, 3 PoE devices each (video bar, touch controller, booking panel)4214 x (25.5 + 13 + 13) = 721 W
Wi-Fi access pointsWi-Fi standard: 8 access points on this floor88 x 25.5 = 204 W
Building systemsDoor access, sensors and cameras on the floor plan1010 x 13 = 130 W
Subtotal2021,055 W
With headroomPorts +25%, PoE +20%253 ports: six 48-port switches1,266 W across the switches

PoE is counted at the class limit of each device, not its typical draw. Uplinks, management and console ports are extra.

MustHouse choice

Count the data outlets the comms room serves from the space types of every room it feeds, plus the access points, building systems and spare outlets on the floor plan.

Why
The space types already say how many outlets each room needs, so the rack is sized from the same record the rooms are built from.
How to check
The design's port count matches the sum in Keia Atlas for that comms room, within the spare outlets listed.
MustHouse choice

Provide at least 25% more switch ports than the count, and at least one spare 48-port patch panel's worth of rack space.

Why
Moves and new devices arrive every year; a full switch turns a small change into a project.
How to check
Ports in use divided by ports installed is 80% or less at handover.
MustHouse choice

Add up the PoE class limit of every powered device on each switch, then choose switches whose PoE budget is at least 20% above that total.

Why
Devices draw up to their class limit when they start or when a camera heats up; a budget that is only just enough drops devices at the worst moment.
How to check
The switch's PoE budget in its data sheet is at least 1.2 times the design's total for the devices on it.

Source IEEE 802.3bt

MustHouse choice

Leave at least a quarter of the rack's units empty at handover, fitted with blanking panels.

Why
Space for the next switch, and blanking panels keep hot exhaust air from circling back to the front.
How to check
Count the empty units on the rack elevation in the handover pack.

Source ASHRAE TC 9.9

The rack itself

4 rules
ShouldHouse choice

Use a 19-inch four-post rack, 42 or 45 units high, 800 mm wide where there are more than 48 patched ports, and at least 1000 mm deep.

Why
The extra width takes vertical cable managers so patch cords do not cover the equipment; the depth takes switches and a UPS.
How to check
The rack's data sheet and the rack elevation drawing.

Source EIA-310-E

MustHouse choice

Fit a 1U horizontal cable manager above or below every patch panel and vertical managers on both sides.

Why
Patch cords then run to the side and down, and every port and label stays readable.
How to check
No patch cord crosses in front of another device.
MustHouse choice

Use the shortest stocked patch cord that reaches with a gentle loop, and no coils behind managers.

Why
Coils block airflow and hide faults.
How to check
Look behind the managers on handover.
ShouldHouse choice

Put the heaviest kit (UPS, batteries) at the bottom, patch panels and access switches in the middle alternating panel and switch, and fibre panels at the top.

Why
A low centre of gravity, and each switch sits next to the ports it serves so patch cords are short.
How to check
The rack elevation in the handover pack.

The comms room

4 rules
Must

Keep at least 1 m clear in front of and 0.6 m behind every rack, and do not store anything in the comms room.

Why
Room to work and to swap a switch without moving the rack; a store room becomes a fire risk and blocks access.
How to check
Measure on site, and photograph the room at handover.

Source ANSI/TIA-569-E

Must

Keep the air at the front of the racks between 18 and 27 degrees C, with cooling that runs all year and all night.

Why
That is the range the equipment manufacturers design for; building air conditioning that turns off at night cooks a comms room.
How to check
A temperature sensor at the rack front reports to monitoring, with an alert above 27 degrees C.

Source ASHRAE TC 9.9

MustHouse choice

Lock the comms room on the building's access control, with entries logged.

Why
Network kit is the easiest way into the network, and the log answers who was in the room.
How to check
The door is on access control and only the IT and facilities groups can open it.
Must

Bond every rack to the room's telecommunications earthing busbar.

Why
See the power and earthing standard.
How to check
A bonding conductor from each rack to the busbar, labelled.

Source ANSI/TIA-607-D

Sources

Public standards are named and summarised in our own words, never quoted. Most are sold by the bodies that publish them.
Public standardEIA-310-E, Cabinets, Racks, Panels and Associated EquipmentDefines the 19-inch rack: the mounting width, the 44.45 mm rack unit and the hole spacing that lets any manufacturer's kit fit any manufacturer's rack.Electronic Components Industry Association · checked 29 Sept 2026
Public standardANSI/TIA-569-E, Telecommunications Pathways and SpacesDescribes telecommunications rooms, including their size, access, clearances around racks and environmental needs.Telecommunications Industry Association · checked 29 Sept 2026
Public standardANSI/TIA-607-D, Generic Telecommunications Bonding and Grounding (Earthing) for Customer PremisesDescribes bonding racks and trays to the telecommunications earthing busbar.Telecommunications Industry Association · checked 29 Sept 2026
Design guideASHRAE TC 9.9, Thermal Guidelines for Data Processing EnvironmentsGives the recommended air temperature and humidity at the inlet of IT equipment (a recommended range of 18 to 27 degrees C), and airflow practice such as blanking empty rack units.ASHRAE · checked 29 Sept 2026
Public standardIEEE 802.3bt, Power over Ethernet over four pairs (and 802.3af and 802.3at before it)Defines the PoE types and classes, and the most power a switch port must provide for each class, from 15.4 W (class 3) and 30 W (class 4) up to 90 W (class 8) at the switch.IEEE · checked 29 Sept 2026

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About Racks and comms rooms

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.