Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Assets is switched off

Device types, units, models, setup guides, standards, IT stores and cables. This demo has the Assets module switched off in Organisation settings.

Organisation settings

In-room switchNYC20.04 HeronNETGEAR Engage · read 06:00Simulated

nyc-2004-sw01

Switch nyc-2014-as01 port 16, LAN 9: planned tagged 30, seen tagged 30 and 40: VLAN 40 AV leaves the roomchecked just now

The ports

Netgear AV Line M4250-9G1F-PoE+ (GSM4210PD) · 11 ports
LAN 130LAN 240LAN 3–LAN 4–LAN 5–LAN 6–LAN 7–LAN 8–LAN 910SFP 1–LAN 10–
  • 10 Management
  • 30 Room systems
  • 40 AV
  • X 802.1X · M MAC check (MAB)
  • P Parked: patched, nothing plugged in
  • – Disabled: nothing patched
  • To review: the switch differs from the plan

Restricted: rack and switch ports Recorded for the demo, as NETGEAR Engage would report it. Select a port to open what is plugged into it.

To review

1 port
  • To review
    LAN 9 · Switch nyc-2014-as01 port 16

    Planned tagged 30, seen tagged 30 and 40: VLAN 40 AV leaves the room.

Every port in use

3 in uses, 0 parked, 8 disabled
PortOn itModeVLANPlanChange
LAN 1Video codec · nyc-2004-vc01Its LAN 1 · The switch powers the codec (PoE+)AccessMAC check (MAB)Planned VLAN 30 Room systemsAs planned
LAN 2Video codec · nyc-2004-vc01Its LAN 2 · Link-local network for Poly IP peripheralsAccessMAC check (MAB)Planned VLAN 40 AVAs planned
LAN 9Switch nyc-2014-as01 port 16Uplink through Wall outlet A4Trunk, tagged 30Planned VLAN 10 ManagementSwitch reports: tagged 30, 40To reviewPlanned tagged 30, seen tagged 30 and 40: VLAN 40 AV leaves the room.

Disabled, nothing patched: LAN 3, LAN 4, LAN 5, LAN 6, LAN 7, LAN 8, SFP 1, LAN 10.

If this were off

Simulated

The space this switch serves.

20.04 Heron New York office

Would affect 1 space, 4 meetings in the next 24 hours (21 people) and 1 service

  • Level 20: welcome and meeting floor

  • Level 21

  • Level 22

Would be affected: a projection, not a fault Keeps workingRestricted: floor plan

Spaces it takes off 1

As recorded

NetBox's names
The switch's record, with every interface's cable trace
id: nyc-2004-sw01
space: nyc-20-04
position: network-switch
platform: netgear
interfaces:
  - name: lan-1
    enabled: true
    mode: access
    untagged_vlan: 30
    auth: mab
    connected:
      device: AG-000597
      interface: lan-1
  - name: lan-2
    enabled: true
    mode: access
    untagged_vlan: 40
    auth: mab
    connected:
      device: AG-000597
      interface: lan-2
  - name: lan-9
    enabled: true
    mode: tagged
    untagged_vlan: 10
    tagged_vlans:
      - 30
    connected:
      cables:
        - NYC-20.14-R1-U06-P16
        - nyc-cb-17
      device: nyc-2014-as01
      interface: 16
    seen:
      tagged_vlans:
        - 30
        - 40
      at: 2026-10-21T06:00:00Z
disabled:
  - lan-3
  - lan-4
  - lan-5
  - lan-6
  - lan-7
  - lan-8
  - sfp-1
  - lan-10

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About nyc-2004-sw01, New York office

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.